DESCRIPTION

‘No Needless Medication Errors’. Gillian Honeywell, Chief Pharmacist NHS Isle of Wight. South Central. Medication Errors do happen. South Central. Facts and figures. Medicines are the most frequently used healthcare intervention 97% of all hospital patients take a medicine

1 / 18

Télécharger la présentation

‘No Needless Medication Errors’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ‘No Needless Medication Errors’ Gillian Honeywell, Chief Pharmacist NHS Isle of Wight South Central

  2. Medication Errors do happen.. South Central

  3. Facts and figures Medicines are the most frequently used healthcare intervention 97% of all hospital patients take a medicine 6% of hospital admissions are a direct result of problems with medicines including side effects1 Poor communication between care settings is responsible for up to 50% of all medication errors & up to 20% of adverse drug reactions that occur in hospital 2 Average DGH has 350 medication errors per day NPSA: medication errors account for 9% total • Pharmacy in England Building on strengths – delivering the future, Department of Health. 2008 • NICE/NPSA patient safety guidance to improve medicines reconciliation at hospital admission. National Patient Safety Agency. December 12 2007 available from http/www.npsa.nhs.uk/corporate/news/guidance-to-improve-mrdicines-reconciliation/ South Central

  4. Project Plan Project 1: Metrics: 3rd year: Improvement Methodology: Trust Quality Standard kpi’s and SHA monitoring 1: Means of ensuring patient receive oral anticoagulation therapy within safe parameters (INR >5 & >8) 2: Medicines reconciliation: safer admission to hospital: patients’ medicines are reconciled within 24 hours of admission 3: Allergies: A means of ensuring that patients allergy status is recorded on prescription charts Project 2: Promoting the safer use of injectable medicines Pre-filled syringes for high risk medicines: nursing time released to care Risk assessments to reduce errors with injectables: collaborative procurement South Central

  5. Project Plan Project 3: NSAID related harm Baseline audit completed. Usage data reported 3 monthly, preparation for monthly prescription metric Project 4: Reduction of harm from omitted and delayed medicines in hospital Baseline audit for antibiotics completed. Single Trust audit for all drugs / doses completed. Preparation for monthly metric Project 5: Reduce the number of errors and harms with insulin Baseline audits completed.Preparation for monthly metric Project 6: Standardised accessible Medicines Management Training E-learning modules for all aspects of the medicines trail, for all professions. South Central

  6. Metric 2: Medicines Reconciliation Implementation of 7 Day Working Target line Implementation of Green Bag Scheme Staff vacancies NHS Isle of Wight South Central

  7. Green Bag Scheme £20,000 Pump Prime PSF Medicines reconciliation supporting the safe transfer of patient’s medicines between care settings QIPP and Waste Campaign Recent audit in South Central: estimated saving of approx. £10 per patient admitted- from admissions data this equates to potential savings of £3.6million A further £1.26m from MR safety cost- avoidance for 70% of these patients South Central

  8. Medicines Reconciliation Percentage of Meds Rec Completed (since 01 Apr 2011) %

  9. Medicines Reconciliation Acute Trusts in FY 2011 %

  10. Medicines Reconciliation Further Cost Avoidances Costs Avoided

  11. Isle of Wight Example 1. Estimated cost avoidance from medicines reconciliation within 24 hours of patient arrival (per patient). 2. HES data admission figures for 2010/11 and calculated uplift (3%) for 2011/12. 3. Actual data collated by Trust – used to calculate % achieved 4. Calculated avoidable and avoided costs (monthly average from 2 applied to % achieved from 3) • Therefore, using IoW data for 2011 : • £5 cost avoidance per patient x 26688 admissions = £113,340 total • Average of 61% medicines reconciliation achieved = £69,137 in cost avoidance achieved • with 39% further potential savings = £44,203 in avoidable costs

  12. South Central

  13. Safer Use of Injectable Medicines Focus on practical implementation of targeted products identified by NPSA alert 20: • Dobutamine 250mg in 50ml vial • Morphine 1mg/ml & 2mg/ml – 50ml vial • Human soluble insulin 50 units in 50ml pre-filled syringe • Four work streams were funded by PSF : • Injectables: purchasing for safety • Assessing risk to operators from exposure to hazardous injectable medicines • Neonatal Injectables • Medicine package inserts South Central

  14. OUTCOMES Less delay to start administration for emergency injections (Magnesium for eclampsia- 0.5h) Ensure correct concentration (ward based preparation >10% out; Wheeler et al, 2008) Reduced waste Reduced rework (e.g. inadequate labelling) Less risk of contamination Eliminate human error Standardise concentration (ICS standards) Health & safety (needlestick injury, RSI) Assistance with assurance (NHSLA, NPSA alerts)

  15. QIPP OUTCOMES…£261k over 3 years Cost of medicines: Adenosine for cardiac cath labs (save £10k pa) Morphine for PCA and continuous infusion (save £4k pa) Suxamethonium and thiopentone for emergency caesarean section (also eliminate unsafe practice – save £3.5k pa) Noradrenaline PFS – no UK instructions in ampoule pack NHS manufacturing units tender Process improved: 1,667 minutes nurses time per month released by introducing ready to use potassium syringes in adult critical care (approx. 20% band 5 = £5k)

  16. IN PROGRESS • Established current use of NSAIDs and are developing metrics and methodology for QIPP • Medicines management e learning project published on Nelm • Missed doses in process of audit and analysis for potential for metrics • Number admissions hypoglycaemia evaluated for frequency and cost. Insulin in hospital. To identify areas for improvement and metrics • Injectables in the community South Central

  17. Challenges • Linking quality with safety to tangible savings • Engaging with other professions • Moving forward to kpi’s and standards for safety • Communication, continuity and commitment South Central

  18. For more information on the ‘Reducing Needless Medication Errors Workstream’ please see the Patient Safety Federation website www.patientsafetyfederation.uk or contact Fiona Eccleston- Project Manager Fiona.eccleston@iow.nhs.uk South Central

More Related