1 / 14

Improving Outdoor Environments

Improving Outdoor Environments. “Ideas to Implementation”. By the numbers…. 1935 2010 Less than 1% Less than 2% 10% 28 %. What is our Goal?. To provide the best outdoor learning (activity, play, and exercise) environment that we can provide. Pieces of the Puzzle. Infrastructure

tayte
Télécharger la présentation

Improving Outdoor Environments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improving Outdoor Environments “Ideas to Implementation”

  2. By the numbers….. 1935 2010 Less than 1% Less than 2% 10% 28 %

  3. What is our Goal? • To provide the best outdoor learning (activity, play, and exercise) environment that we can provide

  4. Pieces of the Puzzle • Infrastructure • Shade • Pathways • Structures (decks, arbors) • Indoor/ Outdoor Transitions

  5. Pieces of the Puzzle • Settings • Gathering Spaces • Lawns • Water Play • Sand/ Loose soil play • Edible Gardens • Outdoor class rooms

  6. What is the question? • How do we create settings that will equally serve different age children? • What is the answer? • Create settings with different scale.

  7. Designing the RealityThe process of converting conceptual plans into working plans • Converting the plan to scale • Challenging every idea, material, method, installation cost, and volunteer opportunity • Creating a materials list • Creating a budget • Forming a schedule

  8. Community Involvment Beg……. Borrow……. and……. Smile

  9. Who do you need? • A Construction manager • A partner in the construction industry • Specific trade experts • Organizations that can send “armies”

  10. Scheduling Install the infrastructure first Install the settings second Contractor+volunteers+contractor+volunteers+ Volunteers+contractor………..

  11. Ideas • Conceptual Plan vs. Working Drawings • Final Product

  12. The Challenge is….. • ….to provide an environment where children can reconnect with nature and reap all the benefits that come from that experience.

  13. Thank you !

More Related