1 / 8

JetMET Trigger Plans

JetMET Trigger Plans. Leonard Apanasevich University of Illinois at Chicago apana@fnal.gov. Outline. Overview of upcoming trigger planning activities Physics priorities during initial commissioning stage Trigger Coordination Group structure. Higher Level Trigger Activities.

tekla
Télécharger la présentation

JetMET Trigger Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JetMET Trigger Plans Leonard Apanasevich University of Illinois at Chicago apana@fnal.gov

  2. Outline • Overview of upcoming trigger planning activities • Physics priorities during initial commissioning stage • Trigger Coordination Group structure Leonard Apanasevich

  3. Higher Level Trigger Activities • Implement regional unpacking in all subsystems • Example: substantial reduction in regional ECAL unpacking for  + e/ • Code is available for siStrip, other systems pending • Optimization • Code improvement, accept time-outs (600 ms) • Algorithms • Complementary triggers • Control samples • Trigger Menus • Initial trigger menus  • Thresholds, prescales • Trigger DQM • Next Milestone: • Physics-Trigger Week,October 22 - 26 Wesley Smith Mike Lamont, 20.06.07: Phase A Buildup Leonard Apanasevich

  4. Simulated L1 rates at 1028 • No thresholds other than noise suppression needed at L = 1028-1029 for all triggers: muons, e/, jets, missing ET, HT Plot made using 10 million minbias events - no pileup (from S. Dasu) Leonard Apanasevich

  5. Physics Priorities for Phase A • Calibrate the detector • Begin to re-establish the Standard Model • Minbias PT and Rapidity Distributions • Study Jet Angular Distribution, DiJets • Establish MET • Gamma + Jet Calibration • Standard Candles: J/Ψ, Υ, W, Z Leonard Apanasevich

  6. Trigger Coordination Organigram Leonard Apanasevich

  7. TSG Needs You! Volunteers needed from POGs/PAGs/DPG’s • Trigger Menu Development • Study rates and prescale factors • Measure efficiencies • HLT Algorithm Development • Implement and maintain HLT paths • Trigger Menu Implementation • Study misalignment/miscalibration effects • Trigger Performance • Trigger Validation • Write DQM monitoring software • Evaluate CPU/memory usage Leonard Apanasevich

  8. Priorities for JetMET • Need a volunteer to prepare release validation plots • L1 and HLT rates and efficiencies for our base triggers • Eventually migrate these into the DQM infrastructure • Begin studying misalignment/miscalibration effects • Alignment and calibration scenarios based upon 10 pb-1 and 100 pb-1 of data in place for most sub-systems. • Implement regional unpacking/reco for jets Leonard Apanasevich

More Related