1 / 2

The ATS MD part II (Achromatic Telescopic Squeezing scheme)

The ATS MD part II (Achromatic Telescopic Squeezing scheme). Participants : R. Assmann, R. De Maria, S. Fartoukh, M. Giovannozzi, B. Goddard, P. Hagen, W. Hofle, R. Miyamoto, G. Mueller, S. Redaelli, M. Strzelczyk, R. Steinhagen, R. Tomas,

tekli
Télécharger la présentation

The ATS MD part II (Achromatic Telescopic Squeezing scheme)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The ATS MD part II(Achromatic Telescopic Squeezing scheme) Participants: R. Assmann, R. De Maria, S. Fartoukh, M. Giovannozzi, B. Goddard, P. Hagen, W. Hofle, R. Miyamoto, G. Mueller, S. Redaelli, M. Strzelczyk, R. Steinhagen, R. Tomas, G. Vanbavinckhove, Jorg Wenninger, F. Zimmermann Goal: “Pre-squeeze’’ IR1 and IR5 to b*=1.2 m. Type of beams: fat pilot 1E10, ge<1.5 mm  safe beam Machine conditions:ADT off (but for injection oscillations), flat machine most of the time (no X-angle), OFB and QFB switched ON during ramp and squeeze, existing settings for TCP, TCS, TCDQ (relaxed settings for TDI and TCT). Second MD block: 1) Wed 28/06/2011, 04:00/08:00  HWC of injection/ramp/pre-squeeze/squeeze  Optics & knobs and full ATS-ramp & ATS-squeeze LSA beam processready (within a few details) down to b*=30 cm at IP1 & b*=1.2 m at IP5 2) Sun 03/07/2011, 00:00/08:00  MD with beam S. Fartoukh, LSWG 24/06/2011

  2. S. Fartoukh, LSWG 24/06/2011

More Related