Paul Dyer. . . . What am I going to talk about ?Risk ManagementMaintenance strategiesPlant specific diagnosticsWhat are the benefitsSummary. Paul Dyer. . . . Ensure safety of staff and members of the publicPrevent interruption to supplyExtend the useful life of the assetEnsure that the most cost effective solutions in placeEnable informed asset replacement policy.
E N D
1. Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER
DAVE OPENSHAW
London Electricity Group Thank you for the introductionThank you for the introduction
2. Paul Dyer What am I going to talk about ?
Risk Management
Maintenance strategies
Plant specific diagnostics
What are the benefits
Summary
London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
3. Paul Dyer Ensure safety of staff and members of the public
Prevent interruption to supply
Extend the useful life of the asset
Ensure that the most cost effective solutions in place
Enable informed asset replacement policy
London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
4. Paul Dyer
5. Paul Dyer
6. Paul Dyer London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
7. Paul Dyer Reactive FOR
Considered to be cheap
No policy to develop
No routine maintenance to budget for
AGAINST
Safety risk
Unscheduled down time
Damage to plant
Teams always to be ready
Loss of confidence
8. Paul Dyer FOR
Easy to predict labour and plan
Can ensure maintained before failure
AGAINST
Not easy to predict failure
Easy to over or under maintain Time based
9. Paul Dyer Duty based FOR
Tailored to actual usage
Minimises work
AGAINST
Needs development work to set duty levels
Requires hours run or other duty counters
10. Paul Dyer Condition based FOR
Tailored to plant condition
Minimises work and knowledge of plant condition
AGAINST
Needs development work to set condition levels
Requires diagnostic equipment
Requires some skill to assess condition
11. Paul Dyer Transformer diagnostics
Moisture and dielectric tests
Dissolved gas in oil analysis
Furfuraldehyde analysis
Hydran on/off line
Metal in oil
Particle analysis London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
12. Paul Dyer Maintenance strategies Switchgear
So what diagnostics do we have available?
1. Discharge
Transient Earth Voltage monitoring
Ultrasonic detection
Radio frequency detection
Discharge sensitive gel London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
13. Paul Dyer
14. Paul Dyer Maintenance strategies Cable diagnostics
Why are we interested in cables?
Main cause of loss of supply
Failure is common
Adversely affects KPIs
Main nuisance to customers
London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
15. Paul Dyer Maintenance strategies Cable diagnostics
So what can we do?
Monitor failures
Off line partial discharge tests
On line partial discharge monitoring
London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
16. Paul Dyer SUMMARY
What measurements are important?
Evaluate the risk to the system
What data tells me most about equipment operating condition?
Do I need to take measurements from each item
How much will it cost ?
How much time interpreting the results?
Will the measurements be acted upon?
London Electricity
Then a brief summary of the electrical network
London Electricity
Then a brief summary of the electrical network
17. Paul Dyer Maintenance strategies
THE END
Any questions? London Electricity