1 / 5

Subyearling Chinook Survival LGR to McN preliminary results

Subyearling Chinook Survival LGR to McN preliminary results. Jerry McCann Fish Passage Center. Subyearling Releases included in Survival Estimate and Transport Proportion estimate. 4 cohorts based on LGR passage date 5/20-6/2, 6/3-6/16, 6/17-6/30, 7/1-7/15 Hatchery release groups included

terrel
Télécharger la présentation

Subyearling Chinook Survival LGR to McN preliminary results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subyearling Chinook Survival LGR to McNpreliminary results Jerry McCann Fish Passage Center

  2. Subyearling Releases included in Survival Estimate and Transport Proportion estimate • 4 cohorts based on LGR passage date 5/20-6/2, 6/3-6/16, 6/17-6/30, 7/1-7/15 • Hatchery release groups included CJRAP,GRAND1,PLAP,SNAKE3,SNAKE4,BCCAP,CEFLAF,LUGUAF, NLVP,NPTH PIT Release dates between 5/03 and 7/6 • Wild groups SNAKE3,SNAKE4,CLWR PIT Release dates between 5/02 and 8/1 LGR Timing-Hatchery MCN Timing-Hatchery PIT

  3. Hatchery subyearling Chinook Survival LGR to McN

  4. Environmental Conditions Avg Temp C Water Transit Time Avg Spill Proportion

  5. Transport Proportions Detect Probabilities for 13H Collection for Transportation began on August 18 at McNary Dam An estimated 99% of Snake River Ch0 Prod, Wild PIT passed by that date.

More Related