An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SoCalGas/SCE Integrated Multifamily Demonstration Project Presentation to the LIOBJuly 10, 2012

  2. Background • LINC Housing – 274 Unit affordable housing complex in Santa Ana, CA • Project initiated by California Housing Partnership Corporation (CHPC) • Work group collaboration includes: CHPC, LINC Housing, Stewards of Affordable Housing for the Future (SAHF), Century Housing, SoCalGas & SCE

  3. Background • IOU Objectives: Develop integrative, sustainable & replicable approaches to comprehensively treat targeted MF complexes in order to achieve deep energy savings • Test Various MF Strategies Including: Single Point of Contact, multi-program coordination, pre/post-installation energy analysis, referral coordination, streamline practice and delivery & test new EE technologies etc.

  4. Project • Joint utility coordination effort between SoCalGas & SCE • IOU energy efficiency programs involved • Energy Savings Assistance Program (Joint SCG & SCE implementation) • Solar Thermal (CSI program) • MF Direct Install Programs (SCG & SCE – No cost to LINC) • MF EE Retrofit Rebates (SCG and SCE) • EE Education for Residents/Kids • Emerging Technologies to conduct ‘In Unit’ testing • On-Bill Financing/Line-item Billing • ESAP &/or third party contractor(s) available for market rate installations • Provide recommendations beyond gas/electric – Connection to MWD & Santa Ana Public Works Agency (water measures)

  5. Initial Successes • Single Point of Contact provides simplified & customer friendly approach to owner/tenants in addressing multi-program accessibility issue (including both IOU and non-IOU programs) • Owner/Work Group collaboration maximizes savings opportunities & delivers cost effective implementation timelines (simultaneous installation of retrofits/measures, where possible) • Owner works with IOUs to engage tenants early and throughout the project • Use of dual utility contractor to deliver multiple programs during a single visit imposes smallest possible impact to tenants • IOU funded programs allow owner to stretch dollars and provide additional deep energy savings measures not funded through the IOUs