4 Reasons to Implement BIM for Infrastructure Projects

Building Information Modeling (BIM) has become a game-changer in the realm of infrastructure projects. This innovative approach to project management and design offers a multitude of benefits. we'll explore four compelling reasons why implementing BIM for infrastructure projects is essential for success. From enhanced collaboration to streamlined project management, discover how BIM can revolutionize the way we build our cities and critical infrastructure.

teslacaduk
Télécharger la présentation

4 Reasons to Implement BIM for Infrastructure Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4 REASONSTO IMPLEMENTBIM TOYOUR INFRASTRUCTURE PROJECTS

  2. #1 BIMFOR INFRASTRUCTURE ATPLANNINGAND DESIGNINGSTAGE

  3. ThetoolsprovidedbyBIMforplanninganddesign becomevaluablerightfromtheonsetwhenitcomesto infrastructureprojects.Itcanallowarchitectsand engineerstomapoutinfrastructuredesignthatwould maximizetheusageofavailableland.Itsclash detection and3Dvisualizationcapabilities also allow themto recognizeanychallengesthatwould arisewiththe proposeddesign. Thosechallengesanderrorscouldbe identifiedandriskcouldbe mitigated. Italsoprovides toolsforpropercollaborationbetweenthestakeholders allowinginfrastructurecompaniestobetterpresenttheir ideastothestakeholders.Italsoallowsthevarious membersoftheteamtoeffectivelycommunicate increasingproductivityandreducingmiscommunication.

  4. #2 BIMFORBETTER CONTROLOVER COSTANDTIME

  5. Infrastructureprojectsowingtotheirsizeand complexitiesoftenendupspanning yearsSimilarly, thereisconsiderableamountofmoneyinvolvedinthese projectswhichneedstobeaccountedfor. Using BIM allowsprojectmanagerstogainbettercontrolover costandtimeaspectoftheprojectrightfromthe conception. Forinstance,4DBIMlinksall timeand schedulerelatedinformationtothe3Dmodelsothat anyworkflowerrorscanbedetectedandproject timelinecanbemaintained. Likewise,incaseof5DBIM, costcanbeconnectedtoquantitiessothatanychange inquantitiesisautomaticallyupdatedintermsofcost. Thiswaythroughouttheprojecttheaspectoftimeand costcanberegulatedandcontrolled.

  6. #3 BIMFORFACILITY MANAGEMENT

  7. Theworkneverendswiththeconstructionofthe infrastructureastheverystructureneedstobe thoroughly maintained becauseanymistakesorignored problems couldcauselotofmoneyandresources,orin worstcaseitcouldhaveadverserepercussions. Using BIMcould helpinensuringeffective facility managementandenergyanalysisforsustainability.BIM modelsthatwereusedforconstructioncanbeupdated toreflecttheonsitechangesandas-builtmodelscanbecreated. Theseas-builtmodelsprovideallthe informationlikethelocationofcomponents, manufacturer’sdetails,serialnumbersetc.Sothefacility managershaveahandydatabasewhichtheycanrefer toandquicklycarryouttheirscheduledmaintenance tasks,monitorforupdatesandmakeanyrepairs.

  8. #4 SCANTOBIMFOR RENOVATION

  9. Existinginfrastructurearound worldincludingroads, bridges,watertreatmentplants,damnsetc.areinneed ofregularrepairandrenovation.Itisquiteriskyand errorpronetogointorenovationviamoreconventional methods.ScantoBIMServicesprovidestheexact informationabouttheinfrastructure’sconditionssothatitbecomespossibleandeasierforengineersto properlyplananddesigntheinfrastructureproject. Alot oftimesalongwithrenovationthescopeofprojectalso involvesextensionofthesame.Here,theengineersmust getaholisticview oftheentireexistingnetworkwhich includeselectricallines,wastewaterpipelines,gaslines etc.sothattherearenoclashesbetweentheproposed designandexistingfacilities.Finally,italsoprovidesthe moreconventionalBIMdeliverablesstatedabove ensuringthattheprojectiscompletedwithminimal errorsandontimeandbudget.

  10. Followus: https://www.teslacad.co.uk/ https://www.linkedin.com/company/tesla-cad-uk/ https://www.facebook.com/teslacaduk/ https://twitter.com/teslacaduk/