1 / 5

Caterpillar C13 Development Task Force December 8, 2003

Caterpillar C13 Development Task Force December 8, 2003. Items for discussion. Proposed Scope.

thane
Télécharger la présentation

Caterpillar C13 Development Task Force December 8, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Caterpillar C13 Development Task ForceDecember 8, 2003 Items for discussion

  2. ProposedScope • With the oversight of the HDEOCP, this task force will work toward the development of the Caterpillar C13 engine as a test tool to be used in measurement of engine oil performance against API CI-4, “Supplement 1” and PC-10. Progress will be reported, either directly or via the HDEOCP, to the API/EMA DEOAP.

  3. Proposed Objectives • In the development process, maximize efforts to minimize the cost of the final test method. • Develop a 500 hour test method, using operating conditions specified by Caterpillar and refined by the pre-development group that shows discrimination and reproducibility. BY: March 31, 2004 • Develop additional precision data to support API CI-4. “Supplement 1” and prepare an ASTM Research Report on this work. BY: September 1, 2004 • Further develop the C13 test method for use in PC-10, investigating: CCV, ULSD and other test conditions as the task force may deem necessary. BY: December 31, 2004 • Prepare an ASTM Research Report, draft an ASTM Standard for advancement to a Facilitator, recommend the formation of a surveillance panel and recommend the dissolution of the task force. BY: June 2005

  4. Task Force StructurePre-development task group • Caterpillar, PerkinElmer and SwRI. Membership limited by confidentiality agreements and pre-task force contractual agreements. • Did initial screening with the C12 engine. • Currently working to validate test conditions that will show discrimination between a CI-4 oil formulated to replicate problems encountered in the lab and the field and a CI-4 oil formulated to alleviate those problems. Data will be held within the pre-development group until released by Caterpillar. • Target for completion of this work is early February, 2004.

  5. Task Force Structure (cont’d)Development Task Force • Longer term effort for CI-4, “Supplement 1” and PC-10 • Caterpillar • Abdul Cassim: to provide Caterpillar input on test conditions, experimental test design and contact with potential reference oil suppliers • Chuck Dutart: to provide Caterpillar input on C13 parts, special stand hardware, engine reference materials and mechanical/electronic training and guidance. • Industry expertise • Testing laboratories with future C13 testing capacity • Engine oil formulation and testing experience • TMC – Jeff Clark: to provide a repository for and analysis of “reference oil” data from the task force work. • Chairman: to provide “ASTM” guidance, report to the HDEOCP and develop the initial procedure draft.

More Related