Just In Time. Contents for MRP. JIT in MPC. JIT Example. JIT Application. Non-repetitive JIT. JIT Software. Managerial Implications. JIT in MPC: Major Elements. Zero-x: inventory, transaction, disturbance,… Mainly suitable for high volume, repetitive manufacturing

Télécharger la présentation

Just In Time

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Just In Time

  2. Contents for MRP JIT in MPC JIT Example JIT Application Non-repetitive JIT JIT Software Managerial Implications

  3. JIT in MPC: Major Elements • Zero-x: inventory, transaction, disturbance,… • Mainly suitable for high volume, repetitive manufacturing • Physical Changes: SMED, improved quality, TPM, Poka-yoke, continual improvement, worker involvement

  4. JIT in MPC • JIT Orientation includes several action plans: -Reduction of set-up and lot size -No defects in production -Continual improvement -Worker involvement -Cellular manufacturing • Impact on MPC: JIT can eliminate standard shop floor reporting systems, reduce costs of detailed shop scheduling, reduce WIP and Lead Time, support better vendor scheduling • Hidden Factory: One factory makes product and the other factory processes transactions on papers and computer systems • Ex) Ordering, execution and confirmation of materials moving from on location to next, costs of receiving, shipping, expediting, data entry and processing, accounting and error follow up • Logistical Transactions, Balancing Transactions, Quality Transactions, Change Transactions,…

  5. JIT in MPC • We need a factory having large bandwidth( flexible to volume and variety change)

  6. JIT Example

  7. JIT Example

  8. JIT Example

  9. JIT Example

  10. JIT Example

  11. JIT Applications

  12. JIT Applications • Inventory is like water, as it goes down, the problem becomes visible

  13. JIT Software

  14. Managerial Implications