1 / 19
Efficient Layout Design Tips: Adding Contact to Metal 1 Layer
190 likes | 287 Vues
Discover how to enhance your layout design process by adding contact to the Metal 1 layer using DRC early on. Learn to effectively manage your layout with commands and filters. Ensure accuracy and prevent errors in your layout designs.
Télécharger la présentation
Efficient Layout Design Tips: Adding Contact to Metal 1 Layer
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
Lesson One • Start doing DRC before you get too far with your layout
Here is how you add contact to the poly layer from Metal 1 • Type pc in the layout window
Here is how you undo something • Type the following command in the layout windo
When you prep a schematic for a layout, you will produce an SDL view as well as the src.net
Step 2 • Use the space bar to step through different metal layers
Step 3 • Add text label
More Related