Approaches to Historic Bridge Rehabilitation Case Study #1

Approaches to Historic Bridge Rehabilitation Case Study #1. Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Case Study #1. Hays Street Bridge Rehabilitation. San Antonio, Texas - viaduct over railroad, connecting historic neighborhood to downtown

theta
Télécharger la présentation

Approaches to Historic Bridge Rehabilitation Case Study #1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Approaches to Historic Bridge RehabilitationCase Study #1 Hays Street Bridge Rehabilitation Patrick Sparks, P.E.

  2. Case Study #1 Hays Street Bridge Rehabilitation • San Antonio, Texas - viaduct over railroad, connecting historic neighborhood to downtown • Length: 1400-LF (1000-LF approach + 355-LF trusses) • Date and Truss Spans: • 1881 Whipple w/ Phoenix patent – 225-ft • 1881 Pratt through - 130-ft

  3. San Antonio River Hays Street Bridge East side historic neighborhood Downtown Union Pacific RR

  4. Case Study #1 Hays Street Bridge Rehabilitation • Completed: 2010 • Construction Cost: $3.2 M • Design Team: • Sparks Engineering, Inc. - Prime • Bender Wells Clark – Landscape Architects • Garcia & Wright – Civil • Joshua Engineering - Electrical • Client/Owner: City of San Antonio • Contractor: Jay-Reese Contractors

  5. Case Study #1 Significant Issues Associated With Project • Deteriorated and obstructive concrete approaches • Iron truss evaluation using nondestructive methods • Corrosion of floor beams, U-bolts, stiffeners, pins, lateral struts built-up columns.

  6. Case Study #1 Deteriorated and Obstructive Concrete Approaches • Obstruction • High level of deterioration • Major cost item • Street clearances • Accessibility compliance • Historic significance? • 30-ft width

  7. Case Study #1 How the Deterioration & Obstruction Issue was Resolved • New Concrete Approaches: Cast-in-place concrete • Reduced width to 15-ft • Single piers, 40-ft spacing • Concrete through girder

  8. Case Study #1 Evaluation and Rehabilitation of Iron Trusses 1881 Pratt and Whipple designs Phoenix wrought iron columns Cast-iron joint blocks Wrought iron eyebars Early laminated steel pins “Pneumatic Impact” method by Vern Mesler

  9. Case Study #1 Floor beams, u-bolts, stiffeners, pins, lateral struts, built-up columns

  10. Case Study #1 Lessons Learned/Conclusions • Sensitive and appropriate reconstruction of 1910 approaches saved money, made the project feasible, and improved the outcome for all stakeholders • Nondestructive evaluation was essential for unique 1881 cast-iron/wrought iron trusses. • Appropriate repair and preservation techniques were targeted, cost effective, not overly conservative, and durable.