1 / 10

Cycle Length

Cycle Length. North. Cycle Length. Split Time (Green + Yellow + All-Red). Pretimed Operation. North. Unused Green. Unused Green. Actuated Operation. North. Programmed N/S Split Time. Programmed E/W Split Time. Actuated Cycle Length. Gap Timer (1/2 speed). Detector (Pulse Mode).

thimba
Télécharger la présentation

Cycle Length

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cycle Length North Cycle Length Split Time (Green + Yellow + All-Red)

  2. Pretimed Operation North Unused Green Unused Green

  3. Actuated Operation North Programmed N/S Split Time Programmed E/W Split Time Actuated Cycle Length

  4. Gap Timer (1/2 speed) Detector (Pulse Mode) Ugh! 5 GAP OUT 4 1 3 2 Vehicle Extension Timer

  5. Minimum Green…. 10 20 15 25 3 Min Green GAP OUT Max Green 2 1

  6. Maximum Green…. 10 20 15 25 3 Min Green MAX OUT Max Green 2 1

  7. Traffic Signal Timing & Phasing • Relationship between the Master Clock, Local Clock, and Offset

  8. Traffic Signal Timing & Phasing • Vehicle Trajectory on Time Space Diagram

  9. Decision Zone (1/2 speed) 5 Seconds 2 Seconds Aww…Come On! Decision Zone

More Related