Citizen Scientist Progress Report: Water Monitoring Survey Review

DESCRIPTION

Explore the latest updates from our citizen scientist group on water monitoring efforts. Dive into survey form analysis, Android demos, and SADI introductions, covering monitoring sites, water quality, threats, uses, and more.

1 / 7

Télécharger la présentation

Citizen Scientist Progress Report: Water Monitoring Survey Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report Citizen Scientist Group Mar. 20th, 2012

  2. Done • Abby Kinchy’s survey form review • Amar’s Android demo • Yu’s SADI introduction

  3. Abby’s survey form items (1) • Name of the water body • Tributaries to this water body • Type of the water body • Monitoring place • County or counties of monitoring • Downstream water body • Number of monitoring sites • Latitude and longitude of monitoring sites’ • Towns in which monitoring sites are located • Reasons for selecting monitoring sites

  4. Abby’s survey form items (2) • Monitoring frequency • Water quality • Threatening level of the water body • Local uses of the water body • Indicators and tools used (visual, chemical, biological) • If quality assurance and quality control measures are used • How the participants are trained • How is monitoring data collected and processed • Comments

  5. Abby’s survey form items (3) • How do you rate the current quality of water on a scale of 1-10 ( 10- Pristine) (1- Low, severely impaired, of lowest quality)? • Quality for Aquatic Check • Quality for Human Check • Rate the threats facing the body of water • Agricultural • Industrial • Municipal • Residential • Local uses of the water body • Fishing • Irrigation • Swimming • Boating • Recreational • Storm Water Drainage • Accidental • Other Sources • Visual/Aesthetic • Watering Cattle or other livestock • Industrial Uses • Drinking

  6. Abby’s survey form items (4) • Indicators and tools that are used in monitoring the body of water • Visual Indicators ( eg. camera) • Chemical indicators ( eg. conductivity) • Biological indicators ( eg. macroinvertebrates) • How is the data collected recorded and processed? • Name the water body • Type of water body • Location ( from Mobile phone --> lattitude and longitudinal co-ordinates)

  7. Todo • Robin will follow up on ushahidi.com and pachube.com • Group meeting on UI design