An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LADWP Shoreline Monitoring Program: Progress Report Kent Norville, Air Sciences Inc. 3/17/2010

  2. Outline • Introduction • Monitoring Overview • Available equipment • Events sampled to date • Example Events (2) • Short-Term Path Forward

  3. Introduction • Review of progress to date in implementing the Expert Panel’s recommendations from the September 23, 2009, meeting in Keeler (ref. 1/10/09 Expert Panel Position Statement). • Update of “Shoreline Monitoring Progress Report,” presented at December 7-8, 2009, Expert Panel meeting in Los Angeles.

  4. Equipment Available • 13 E-Samplers: • Six E-Samplers recently factory calibrated. • Seven more went back for factory calibration. Expected back by mid-April. • 6 BGI samplers: • Monthly audits by District • All equipment tested in Keeler Yard before deploying. • LADWP currently has up to six ready-to-deploy pairs.

  5. Events Sampled to Date

  6. 9/30/2009 • Wind from the South • A BGI/E-Sampler (2) placed in North Beach Area. • North Beach TEOM from District • TEOM 1-hour Max = 280.7

  7. 9/28-9/30 event

  8. 9/29-9/30

  9. 12/22/2009 Event • Wind from the North • A BGI/E-Sampler pair placed at Flat Rock shoreline. • Flat Rock TEOM and wind data from District’s Dust Report Archive • Flat Rock TEOM 1-hour Max = 1,897 mg/m3 • Flat Rock TEOM 24-hour Max = 214 mg/m3 • BGI 24-hour = 492 mg/m3

  10. BGI, 492 223

  11. Time Resolved BGI and FR TEOM

  12. Time Resolved BGI and FR TEOM

  13. Time resolved BGI with Wind Speed

  14. Short Term Path Forward • Deploy available BGI/E-Sampler pairs through the end of the current dust season (June 30). • Obtain all filter weights from the District. • By September 1, time-resolve the BGI concentrations for purposes of calculating K-factors. • Compare BGI/E-Sampler K-factors with default K-factors and Dust ID K-factors.

  15. Areas of Interest for Monitoring • Shoreline north of Study Area 1 • Cottonwood Point (for comparison with Stanley values)

  16. Monitor Location Areas of Interest for Monitoring • Area between Shell Cut and Flat Rock • Area between Shell Cut and Dirty Socks.