1 / 1

Fusion Industry Innovation Forum (FIIF) Technology Road Map

Fusion Industry Innovation Forum (FIIF) Technology Road Map.

trang
Télécharger la présentation

Fusion Industry Innovation Forum (FIIF) Technology Road Map

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fusion Industry Innovation Forum (FIIF) Technology Road Map • The next generation tokamak after ITER (= DEMO) shall demonstrate the generation of a significant (several hundred mega watts) amount of electricity to the grid as well as the autonomous operation of the closed fuel cycle. • Two options shall be investigated • DEMO 1 (construction start 2030, Pulsed operation) • DEMO 2 (construction start > 2040, steady state operation) • Development and integration of remote maintenance concepts as a leading requirement of the design • Regulators and utilities should be integrated into the conceptual design process. • Preparation of industry to be involved in the design and systems studies at the start of the design process. • Identify the cost effective technologies that lead to a sustainable design of DEMO on the basis of ITER design and operating experience • To be proposed by a dedicated team of the FIIF under the supervision of the chairman • Close collaboration and tuning with the road map to be developed by the Power Plant Physics and Technology (PPPT) team of EFDA

More Related