SlideServe
Menu
Préférences
© SlideServe · v2026

Requirements Management Plan - Documents

trenton avatar
12 diapositives · 304 Views · Nov 05, 2012

Requirements Management Plan - Documents. Author: Oldřich Vašut Course: SAN 2008. Outline. Introduction What is RM Plan? RM Plan description, relationships to other plans Documents. Introduction to Requirements Management.

Requirements Management Plan - Documents - slide 1
01 / 12Requirements Management Plan - Documents
1 / 17

Télécharger la présentation

Requirements Management Plan - Documents
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Requirements Management Plan - Documents Author: Oldřich Vašut Course: SAN 2008

  2. Outline • Introduction • What is RM Plan? • RM Plan description, relationships to other plans • Documents

  3. Introduction to Requirements Management • Requirements management involves establishing and maintaining agreement between customer and developer on both technical and non-technical requirements. This agreement forms the basis for estimating, planning, performing, and tracking project activities throughout the project and for maintaining and enhancing developed software.

  4. Introduction to RM - Key activities • planning the requirements phase • establishing the requirements process • controlling requirements changes • minimizing the addition of new requirements (scope creep) • tracking progress • resolving issues with customers and developers • holding requirements reviews

  5. Requirements Management Plan • A requirements management plan is a component of the project management plan. Generally, the purpose of RM is to ensure customer and developer have a common understanding of what the requirements for an undertaking are. Several subordinate goals must be met for this to take place: in particular, requirements must be of good quality and change must be controlled. The plan documents how these goals will be achieved. Depending on your project standards, a variety of sections might be included in your RM plan.

  6. Sections of RM Plan • introduction to RM and document overview • document scope • issues affecting implementation of the plan, such as training on the RM tool • applicable documents, such as policies and standards • terms and definitions used in the plan - if your use of the term “requirement” includes several requirement categories, define it here • methods and tools that will be used for the RM process (or the requirements for selecting a tool if one is not selected) • the RM process, including any diagrams of the process • authorities and responsiblities of participants • strategy for achieving requirement quality, including traceability and change control

  7. Relationship to other plans The following is a mapping of Requirements Management Plan sections to artifacts that may contain complementary information:

  8. Document based Requirement Artifacts and Types • Vision (VIS) – Stakeholder Need (NEED), Product Feature (FEAT) • Glossary (GLS) – Term (TERM) • Business Rule Reference (BR) – Business Rule (BR) • Use-Case Model Survey • Use-Case Specification (UC) – Use-Case Detail Requirement (UCDR) • Supplementary Specification (SS) – Supplementary Requirement (SUPP) • Test Plan (TPL) – Test Plan Requirement (TPR) • Test Case (TC) – Test Requirement (TR) • Issues (ISU) – Issue (ISS) • Assumptions (ASM) – Assumption (ASM)

  9. Traceability Criteria

  10. RM Plan Template • 1. Introduction1.1 Purpose1.2 Scope1.3 Definitions, Acronyms, and Abbreviations 1.4 References 1.5 Overview • 2. Requirements Management • 2.1 Organization, Responsibilities, and Interfaces • 2.2 Tools, Environment, and Infrastructure • 3. The Requirements Management Program • 3.1 Requirements Identification • 3.2 Traceability 3.2.1 Criteria for <traceability item> • 3.3 Attributes 3.3.1 Attributes for <traceability item> • 3.4 Reports and Measures • 3.5 Requirements Change Management 3.5.1 Change Request Processing and Approval 3.5.2 Change Control Board (CCB) 3.5.3 Project Baselines • 3.6 Workflows and Activities • 4. Milestones • 5. Training and Resources

  11. References • Requirements Management Plan Example http://www.ibm.com/developerworks/rational/library/4421.html • REQUIREMENTS MANAGEMENT PLANhttp://www.baz.com/kjordan/swse625/htm/rm_plan3.htm • REQUIREMENTS MANAGEMENT http://www.jiludwig.com/Requirements_Management.html • Requirements Management – SRM http://www.akamonitor.cz/2007/08/sprva-poadavk-v-studijnm-plnu-manaersk.htm • Requirements Management Plan Templatehttps://cabig.nci.nih.gov/workspaces/TBPT/Templates/caBIG_Reqts_%20Mgt_Plan.doc

  12. End • Thanks for favour.