Domino House Week 4 of 6

Domino House Week 4 of 6. EGR 105 Project Fall 2002. Architect: 300-350 dom internal area 5 interior rooms Openings into interior room of 2-4 lyns No interior doors Due to addition of (plain) interior walls: Blankness increase to 60-70% is okay

tuari
Télécharger la présentation

Domino House Week 4 of 6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Domino HouseWeek 4 of 6 EGR 105 Project Fall 2002

  2. Architect: 300-350 dom internal area 5 interior rooms Openings into interior room of 2-4 lyns No interior doors Due to addition of (plain) interior walls: Blankness increase to 60-70% is okay Minimum Blankness Dispersion Ratio is dropped to 65% I/E Ratio > 1.25 Final Design Requirements

  3. Project Manager: Stronger, more expensive anchors are available (see next slide) Change in time estimating: 3 wex to position a single domino (up from 2) Requirements: Maximum cost of 10 zwigs per dom of interior space Maximum time to build of 2.65 times the number of dominoes (n) Final Design Requirements

  4. Structural Engineer: See appendix on substructures/multiple anchors Stronger anchors available: Final Design Requirements

  5. Thermal Engineer: Tighter average temperature requirement: 50oD < Taverage < 60oD Final Design Requirements