Upcoming Topics and Projects. Romit Roy Choudhury Dept. of ECE. Topics Timeline. Wireless LANs, infrastructure networks. Topics Timeline. Wireless LANs, infrastructure networks Multi-hop Routing Ad hoc networks, Mesh Networks Delay Tolerant Networks. Topics Timeline.

1 / 22

Télécharger la présentation

Upcoming Topics and Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upcoming Topics and Projects Romit Roy Choudhury Dept. of ECE

  2. Topics Timeline • Wireless LANs, infrastructure networks

  3. Topics Timeline • Wireless LANs, infrastructure networks • Multi-hop Routing • Ad hoc networks, Mesh Networks • Delay Tolerant Networks

  4. Topics Timeline • Wireless LANs, infrastructure networks • Multi-hop Routing • Ad hoc networks, Mesh Networks • Delay Tolerant Networks • Sensor Networks • MAC (energy-awareness) • Dissemination, aggregation • Reliable transport

  5. Topics Timeline • Wireless LANs, infrastructure networks • Multi-hop Routing • Ad hoc networks, Mesh Networks • Delay Tolerant Networks • Sensor Networks • MAC (energy-awareness) • Dissemination, aggregation • Reliable transport • Transport Layer (Wireless TCP) • Variants of TCP • Rate based transport

  6. Topics Timeline • Wireless LANs, infrastructure networks • Multi-hop Routing • Ad hoc networks, Mesh Networks • Delay Tolerant Networks • Sensor Networks • MAC (energy-awareness) • Dissemination, aggregation • Reliable transport • Transport Layer (Wireless TCP) • Variants of TCP • Rate based transport • Sensor Network Applications

  7. Topics Timeline • Wireless LANs, infrastructure networks • Multi-hop Routing • Ad hoc networks, Mesh Networks • Delay Tolerant Networks • Sensor Networks • MAC (energy-awareness) • Dissemination, aggregation • Reliable transport • Transport Layer (Wireless TCP) • Variants of TCP • Rate based transport • Sensor Network Applications • Security - MAC and routing

  8. Contents and Project topics

  9. Infrastructure-based Wireless LANs • Improving the fundamental MAC layer • Measurement based rehearsal • Determine the interference graph by rehearsing • Space-Time Scheduling • Only ensure transmitter is idle • Exploit wired infrastructure • For distributed scheduling • Cognitive MAC • Aware of the environment, toggles between CSMA/TDMA

  10. Infrastructure-based Wireless LANs • (Linux) Hacking project • Code routers, deploy sniffers, etc. • Characterizing traffic behavior, human connections • Smart Antenna based APs • Clients are omnidirectional • This combination not studied earlier • Location aware MAC (TDMA flavor) • Hash the location of a node • Deterministic backoff based on the hash value

  11. Routing (Ad Hoc, Mesh) • Routing protocols, metrics • Reliable (alternate-path) routing • Wireless channel fluctuates too much • Offer reliability over this media - tradeoff performance

  12. Delay Tolerant Networks • Moving away from the ad hoc model • Utilizing mobility for data transport • Exploiting node density

  13. Delay Tolerant Networks • Several new challenges • Broadcast • Flooding, or any variant does not work • Network heavily clustered • Routing • No end to end path • How do you know who will meet whom (distance vector) • Can you exploit GPS location • Exploiting infrastructure • Can you deploy buffers in the network intelligently • UAV can be used for improving connectivity

  14. Delay Tolerant Networks • Congestion Control • Network graph exhibits power law • Some popular nodes will be heavily used for routing • Privacy • Nodes need to disclose their mobile trajectory • Will you reveal that information? How to route without? • Implement DTN on sensor motes • Distribute mote to students • Collect human traces, contact patterns, reconnection time • Designing new mobility models • Human behavior models

  15. Sensor Networks • Energy-awareness is key • Sensed information aggregation, dissemination • MAC, Routing, Reliability • Coverage • Sink mobility

  16. Sensor Networks • Aggregation + Compression • Zip reduces packet-size, but prohibits aggregation • Algorithm for zipping and aggregation • Data suppression • You cannot transmit all sensed data (under given energy) • Which subsets should you transmit • Minimize deviation • Coverage • No location should remain outside sensing range • Do this without GPS information • Mobile sink • Design a MAC protocol • Allow sensors to sleep as much as possible

  17. Sensor Networks • Think / Implement Coool Applications • 3D Google • MapTalks • Body networks

  18. Wireless TCP • Loss discrimination • Technique to determine congestion vs transmission loss • Exploit intermediate buffering • Transport protocol for sensors • Reliable querying of a sensor node • Reliable event delivery (not message)

  19. Security • Sybil Attacks • Spoofing multiple MAC addresses • Detect such attackers • Use smart antennas (spotlight algorithm), multi-channel • Location verification • Node at (x,y) … but reports own location as (r,s) • Identify such attacks • Punish such attacks

  20. Project Timeline • By March 1: • Have a solid problem formulation • Have good notion of the solution approach • Before Spring break: • Have the solution ready • Spring Break: • Start implementing basic idea • No optimization necessary • End March: • Have basic evaluation framework ready • April: • Implement, debug, optimize, … Learn simulator, implementation tools, Etc.

  21. Project Groups • Wayne, Tray • Ola, Soji, Tom • Brian, Ashwin, Roman • Ian, William • Tong

  22. Your Thoughts ?Don’t worry if they are not precise