1 / 7

Upcoming Topics for Wingman-22: Presentations and Talks from January 28th to February 1st

This document outlines the upcoming discussions and presentations for Wingman-22 scheduled between January 28th and February 1st. Key presentations include Thaun Nguyen's focus on control surfaces and airfoil selection for horizontal tails, followed by a session from Arnab Roy and Qi Chengzhi on the wing design process. Thursday talks will cover finalizing cabin dimensions, weight equations, cargo door design, and preliminary analysis of mission equipment. Engaging discussions on engine scaling, costs, and landing gear research will also take place.

cheri
Télécharger la présentation

Upcoming Topics for Wingman-22: Presentations and Talks from January 28th to February 1st

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upcoming Topics Wingman-22 January 28th-Feb 1st

  2. Tuesday Presentation • Thaun Nguyen: • Control surface for horizontal tail • Airfoil selection for horizontal tail • Surface area for elevator • Elevator deflection Vs. V graph at sea level

  3. Tuesday Presentation (Continued) • ArnabRoy and Qi Chengzhi: • Wing Design Process • Selection of wing type and number • Airfoil Selection Criteria • Comparison of 4 different airfoils • Xfoil Results • Preliminary Wing Design Analysis for the aircraft

  4. Thursday Talks: • David Cycon • Finalize cabin Length • Finalize Weight Equations • Cargo door design • Start looking into Mission Equipment

  5. Thursday Talks (Continued) • Javier Bustamante: • Power with Download Included,Deadline: January 28, 2013 • I have incorporated a 15 percent wing download penalty on the vehicle. • Created the hover ceiling, power vs. altitude curve according to those numbers. • Engine Scaling, Deadline: February 11, 2013 • I have began scaling the engines weight and SFC. • I need to find a way to scale the engines dimensions. • Beginning research on variable transmission, Deadline: February 26, 2013 • I will meet with performance group to see if this is beneficial or not necessary. • Also find the differences and benefits from variable transmission or variable engine rpm.

  6. Thursday Talks (Continued) • Trevor Steiner: • Finalize Cost • Landing Gear Research

  7. Thursday Talks (Continued) • Arnab Roy, Qi Chengzhi & Thaun: • Follow up of the presentations • Wingman -22 Gantt Chart (Revisit)

More Related