SC-214/WG-78 SG-3 SG3 Progress and Plans. Plenary 6: 8 – 12 December 2008 Toulouse, France. SG-3 Scope (ATN & FANS1/A+). DO-280B/ED-110B ATN Baseline 1 Continental Services. DO-258A/ED-100A FANS 1/A+ Continental and Oceanic Services. DO/ED-YYY ATN Advanced
E N D
SC-214/WG-78 SG-3SG3 Progress and Plans Plenary 6: 8 – 12 December 2008Toulouse, France
SG-3 Scope (ATN & FANS1/A+) DO-280B/ED-110B ATN Baseline 1 Continental Services DO-258A/ED-100A FANS 1/A+ Continental and Oceanic Services DO/ED-YYY ATN Advanced Continental & Oceanic Services Air INTEROP Req. ED-110B ED-100A DO/ED-YYY ATN INTEROP Ground INTEROP Req. ED-154 DO-305 ED-110B ED-100A DO/ED-YYY FANS INTEROP DO/ED-YYY DO - 280 / ED - 110 FANS 1 / A + ATN Advanced ATN Baseline 1 Oceanic Services Continental & Continental Services Oceanic Services
SG-3 Status Documents and Authors ATN Interop (v0.12) - Frederic Picard D-OTIS – Marty Glatz FANS Interop (v0.6) – Chris Collings PM FIS (v1.0) – Greg Saccone P/OICS (v0.7) – Bruce Eckstein Meetings Attended joint meeting with SG-1 and SG-2 in Melbourne 10/20-10/24 Held telecon 11/10-11/14 Plenary #6 preparation telecon 12/1
SG-3 Plans During Plenary #6 Current Week 12/9 ATN Interop Review Incorporate comments Joint session with DCL and D-TAXI editors P/OICS review 12/10 FANS Interop Review Incorporate comments Review chapter 5 12/12 Begin incorporating updates from plenary #6
SG-3 Plans following Plenary #6 Path to Mature Draft Interop Documents Issue ATN and FANS Interop End December aligned with OSD output Plenary #6 Formal Comment Period January/February 09 Issue Version 1.0 of each document Plenary #7 March 09 Validation Period : March – September 09 PM-FIS Validation of PM-FIS specification required (Jan to Mar 09) Liaison with ICAO for inclusion of PM-FIS in Doc 9880 P/OICS Complete at parameter level