An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEBRUARY 5, 2013 Mc meeting Jay Dwyer Email: jdwyer@iso-ne.com Manual Changes for FRM TMNSR Procurement

  2. Background • In July of 2012 the ISO increased the TMNSR requirement; • The Tariff proposal to increase the Forward Reserve requirement was: • Voted by the Markets Committee at its October 2012 meeting; • Voted by the Participants Committee at its November 2012 meeting; and • Filed with the FERC on November 27, 2012 (ER13-000) to be effective March 1, 2013.

  3. Manual M-36 Changes • Section 2.2.2 revised to: • Delete “minimum” before “requirement”; and • Replace a sentence and numbered subparagraphs summarizing Section III.9.2.1 with a reference to that Section.

  4. Manual M-28 Changes Section 1.1(10): Reference to M-36 modified to refer to Section III.9.2.1. Section 2.1: Delete reference to Section 4 of M-36.

  5. Proposed Schedule

  6. Proposed Schedule Notes The proposed schedule up-dates the Manuals about one month after the Effective Date of the controlling Tariff provisions; A three-meeting process would make these revisions effective in May of 2013. The proposed schedule presumes there would be no objection to doing these revisions in two meetings rather than the usual three; If there are objections, the ISO will request a vote here in April and a Participants Committee vote in May.

  7. Questions