1 / 23

Dec. 8, 2009

Supply Plan for LCD Panel. Dec. 8, 2009. 1. Company Introduction. 2. Logistics Proposal. W/H Service. Forwarding Service. ■ Unico USA Extended W/H Plan. CARSON. 10 mile / 0.20 h. Long Beach Port. ■ Logistics Proposal. AS IS. To Be. REYNOSA JUAREZ. REYNOSA JUAREZ. KOREA CHINA.

uma
Télécharger la présentation

Dec. 8, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supply Plan for LCD Panel Dec. 8, 2009

  2. 1 Company Introduction 2 Logistics Proposal

  3. W/H Service Forwarding Service

  4. ■Unico USA Extended W/H Plan CARSON 10 mile / 0.20 h Long Beach Port

  5. ■Logistics Proposal AS IS To Be REYNOSA JUAREZ REYNOSA JUAREZ KOREA CHINA ESENADA, MX PORT LONG BEACH, USA MANZANILLO, MX PORT ■ Solution 1. Change POD Mexico West Coast Ports LONG BEACH, USA Reduce T/ Time Save Logistics Cost ■ Solution 2 . Trans Loading 3 or 4 X Cntrs 2 or 3 X 53’ Dry Van

  6. ■Analysis T/ Time T/ Time Analysis Change Rout Advantage • □ Via Mexico • Weak Point • No alternative port ( Only Manzanillo port ) • Not enough EQ • No flexible Vessel Schedule • Security problem in transit • Advantage • Low cost • □ Via US West Coast • Advantage • Faster transit time • Alternative port ( Long beach / Los Angeles Port ) • Enough EQ • Flexible Vessel Schedule • More safety in transit • Disadvantage • Higher cost Change Rout

  7. ■ Logistics Proposal Trans Load Type ▶Recommend “ Slip Sheet “ or ISO Plt Size 1.20 X 0.80 m

  8. ■Seamless Logistics Solution • OriginIn Land Trucking Service • Ocean Freight Forwarding Service • Destination Local Drayage Service • - In Bound Drayage & Trucking ( T&E, IT Service ) • Destination Warehouse Service • - Bonded Warehouse service ( TPT Issue service ) • - Trans loading Service ( CFS Service ) • Domestic Trucking Service ( 53’ Dry Van ) • Border Crossing Service ( Up to Reynosa and Juarez ) • Customs Brokerage Service in Mexico side • - IMMEX import • - VMI Warehouse at MX Side • JIT Delivery Service • - JIT Station Service • - Milk Run Delivery Service

  9. ■Transit Time Via US West Coast Nanjing  Shanghai  Long Beach Port  McAllen, TX  Reynosa, MX P/O Cntr drayage Shipping Trans Load Trucking Arrival 9 days 2-3 days 3 days Total : 14-15 days P/O Cntr drayage Shipping Trans Load Trucking Arrival 9 hrs 11 days 2-3 days 3 days Total : 16-17 days P/O Cntr drayage Shipping Trans Load Trucking Arrival 6 hrs 11-13 days 2-3 days 3 days Total : 17-19 days Nanjing  Shanghai  Long Beach Port  Elpaso, TX  Juarez, MX P/O Cntr drayage Shipping Trans Load Trucking Arrival 9 days 2-3 days 2 days Total : 13-14 days P/O Cntr drayage Shipping Trans Load Trucking Arrival 9 hrs 11 days 2-3 days 2 days Total : 15-16 days P/O Cntr drayage Shipping Trans Load Trucking Arrival 6 hrs 11-13 days 2-3 days 2 days Total : 15-18 days

  10. ■W & D Service Warehouse 1 • Equipment - Forklift 15 ea - Slip Sheet Handler : 6 ea - Squeezer : 8 ea - Hustler 3 ea • Security & Alarm system • - 24 hour monitoring system ( 24 camera ) • - 24 hour live guard system • - Alarm system with access control and Motion Sensor • - Yard with 8 ft fence with barbed wire • - All Entries and gates are monitored with digital video • - Fire Alarm System ( Wet Type ) • Yard Space - 45,000.00 Sqft - 20 Dry Van Full Access • Insurance • - Up to $ 100,000.00 • ( Warehouse Liability )

  11. ■W & D Service Warehouse 2 • Equipment - Forklift 16 ea • Squeezer : 6 ea • Slip Sheet Handler : 5 ea - Hustler 2 ea • Security & Alarm system • - 24 hour monitoring system ( 48 camera ) • - 24 hour live guard system • - Alarm system with access control and Motion Sensor • - Yard with 8 ft fence with barbed wire • - All Entries and gates are monitored with digital video • - Fire Alarm System ( Wet Type ) • Yard Space - 60,000.00 Sqft - 30 Dry Van Full Access • Insurance • - Up to $ 100,000.00 • ( Warehouse Liability )

  12. ■W & D Service Domestic Trucking • GPS System available ( Upon Request ) • Walkietalkie for real time cargo tracing • Registered on Almost Steam Ship Line and Terminal • Well maintenance condition • More than 10 years experience. • Own Office at El Paso and McAllen Point • Check Up Real Time Border status • Monitoring border cross • Coordination with Cnee’s broker • Coordination with Cnee

  13. ■Origin Trip Plan Nanjing  Shanghai Guangzhou  Yantian

  14. ■ Long Beach Pot & Terminal Los Angeles port APL TERMINAL APL Hyundai MOL ANZDL Fesco HamburgSud Maersk HYUNDAI APL MOL HANJIN TERMINAL HANJIN COSCO K LINE YANGMING Long Beach port

  15. W/H W/H LGB Port Warehouse in CA El Paso, TX Juarez McAllen, TX Reynosa, MX Juarez, MX ■W & D Service In land rout & T. Time

  16. ■Working Procedure Fill out ISF Form BOOKING DRAYAGE ORDER ISF ON BOARD 72 H Before E.T.D 48 H Before E.T.D VESSEL DEPARTURE Urgent? PRE ALERT SEND S/N A/N Priority Cntr dispatch Plan Trans Load Plan yes Enough EQ no PTT ISSUE Alternative H Trucker VESSEL ARRIVAL Cntr dispatch Trailer dispatch Trans load T & E issue Prepare FACTURA TRAILER DISPATCH Pedimento Issue Border Cross To Reynosa Pick Up Pedimento Dispatch To McAllen TRAILER ARRIVAL Receive Cargo

  17. ■ Back Up Procedure Urgent RM ? Vessel Delay Update E.T.A To Reynosa Check up P. Schedule Arrange Team Driver YES NO Notice to Cnee Normal procedure Match Dead Line ? T/T 36 h YES NO Dispatch Team Driver NO Available Other EQ Shortage EQ YES Change P. Schedule Arrange Back up Trucker On Time Arrive ? YES Problem In transit Dispatch Team driver Pick Up Trailer Border Cross Stand by trucker To Border Cross NO Notice to Cnee

  18. ■Security ■Trans Loading Point Warehouse □ 24 Hours Uniformed Live guard □ Camera monitoring System □ Motion Detector □ CFS area is secured by Fence and Limited Access Permission Job Procedure □ Take picture Before unload & after load □ Inspection unloaded Q’ty comparing with PL □ OS & D sheet issue □ Damage report Issue within 24 hour □ Notice Seal No. to Border crossing point Yard □ All gates are monitored with digital camera system □ 24 Hours Uniformed Live guard □ All gates are monitored with digital camera system □ 8 ft fence with barbed wire ■Border Crossing Point Unico own employee at point □ Check Seal No. when arrive the trailer □ Secured yard Inspection Q’ty Insp. Condition Take Picture High Security Seal

  19. ■ Slip Sheet equipment LCD Panel Packing type

  20. ■Risk Manage Risk Manage Factor

  21. ■Key Performance Index K. P. I • □ Ocean • Vessel on time Departure & Arrival • Lift Volume per week and per month • Lift Volume per Steam Ship Line • □ Warehouse • Cntr On Time Arrive • Trans Loading Volume per Trailer • Monthly Loading / Unloading Volume per Item • Monthly Loading / Unloading Volume per Destination • Efficient Dock operation • Efficient Trans Loading Plan • Efficient Yard Manage • OS & D (over/shortage & damage) • Order fulfillment 100 % • □ In Land Trucking • Efficient Load Plan • Efficient Trailer Space • On Time Delivery • Efficient Dispatch Plan • Transit Time

  22. ■IT Solution FFMS • Cargo Track & Tracing • Auto S/N to Destination • Item Inf. per Cntr • Customization T. Loading inf. • E.D.I with WMS & TMS WMS • Auto F.I.F.O operation • Optimization Cross Dock • Optimization T. Loading • Loading Simulation • E.D.I with WMS & TMS TMS • Trans Load Simulation • Optimized dispatch • Manage Equipment • Domestic cargo Track & Trace • E.D.I with WMS & TMS • FFMS • Box Q’ty / Plt • Dimension / Box • T/L Plt Q’ty • T/L Dimension • Alert for Urgent Cargo • WMS • T. Loading Simulation • Docking Simulation • Optimized T. Loading Plan • TMS • Dispatch Simulation • Load Simulation • Optimized Dispatch Plan • Optimized Load Plan

  23. ■IT Solution Seamless Track & Tracing Action against Urgent Cargo E.D.I Support E.R.P Assist PSI WMS Web Visibility Real Time Track & Tracing TMS Total Logistics System • WMS – Warehouse Manage System , TMS – Trucking Manage System , FFMS – Freight Forwarder Manage System , E.D.I – Electronic Data Interface , PSI – Production Schedule Interface FFMS • ■ Unico Seamless Logistics System’s Strength • Realize Flexible Logistics Solution • * Raw Material operation ( up to plant line ) • * Finish Good operation • * Trans loading Cargo Operation • * JIT Operation • * Milk Run Operation • Real Time Track & Trace by Item Code • Provide Web Visibility • * Release Order via web • * Real Time Monitoring Order Status • * Delivery Order via web per tracing point - Available E.D.I - Flexible for Customize

More Related