The Conway Easterly force main<br>project was undertaken in early 1997<br>by the Orange County Utilities Division.<br>The project was necessary to upgrade<br>existing wastewater transmission systems that were operating over capacity<br>and to service future development in<br>east Orange County. The project<br>included the construction of approximately 8.4 miles of PVC force main and<br>improvements to the existing Conway<br>Area Master Pump Station.

unibell
Télécharger la présentation

orange-county-installs-36-inch-pvc-force-main

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U n i-B e ll P V C P ip e N e w s P age 6 Project Project Location Location Jackso n ville O rlan d o Tam p a M iam i Orange County Installs 36” PVC Force Main Worker preparing 36” DR25 for joint assembly. Utilities Commission. The construction work under Contract 2 included approximately 6.5 miles of PVC force main and connection to the influent force main at the ESAWWTF. The force main sizes included 20”, 24”, 30” and 36” diameter pipe. truck was hauled directly to the site. The pipe delivered by railcar was unloaded at a nearby train depot. From the train depot, a local trucking company delivered the pipe to the pro- ject site. By Roger Crawford, P . Eng. IPEX, Inc. Once pipe installa- tion was started, the contractor installed pipe at an average rate of over 500 feet per day for the entire project. Therefore, it was necessary to have enough pipe delivered from the factory ahead of the con- tractor’s installation rate. All pipe was delivered within a four-month period. The total shipped installed on the pro- Project Project Location Location Jackso n ville O rlan d o In September CONWAY EASTERL Y FORCE MAIN PROJECT ORANGE COUNTY, FLORIDA Tam p a 1992, the Orange County Utilities Divi- sion and Glace & Radcliffe project team initiated preliminary design of the pro- posed force main. Preliminary consisted of sizing and routing assign- ment, addressed area, flows, alternate routes and hydraulic analysis. M iam i The tests were conducted between inline valves along The following is a precis from the Project Summary, by Joe Margio, P .E., Glace & Radcliffe, Inc., Consulting Engineers, Maitland, Florida. the length of the force m ain and consisted of m aintaining design to stay a 100-psi gauge pressure for The Conway Easterly force main project was undertaken in early 1997 by the Orange County Utilities Division. The project was necessary to upgrade existing wastewater transmission sys- tems that were operating over capacity and to service future development in east Orange County. The project included the construction of approxi- mately 8.4 miles of PVC force main and improvements to the existing Conway Area Master Pump Station. the largest ever 36” PVC force main in the U.S. The force main was con- structed between the Conway Master Pump Station and the Eastern Service Area Wastewater Treatment Facility (ESAWWTF). 2 hours. During this testing, which service there was no leakage over the entire 35,000 feet of PVC pipe. pipe and The project was bid and constructed in two contracts. Contract 1 included a section of the project where the county already owned the necessary ease- ments or public road right-of-way was available. Also included was approxi- mately 10,000 feet of 20” PVC force main and improve- ments to the existing Conway Pump Station. Con- tract 2 consisted of a section where the force main was to be within an existing power and across private property. Numerous utility had to be acquired from private prop- erty from the Orlando During final design, consideration was given to the pressure rating of the PVC pipe. Criteria considered during selection of the pipe’s thickness included predicted system pressure and pipe burial depth. The peak system pressure, which could be experienced under an abnormal event in the system, was estimated to be approximately 125 to 150 psi (operating pressure plus surge pressure). It was decided DR25 PVC pipe conforming to AWWA C905 would be selected since its pressure rat- ing is 165 psi. ject included 18,960 feet of 36” PVC pipe, 4,280 feet of 30” PVC pipe, 9,380 feet of 24” PVC pipe, and 2,280 feet of 20” PVC pipe. After installation of all the force main, the pipe was subjected to a pres- sure and leakage test. The tests were conducted between inline valves along the length of the force main and con- sisted of maintaining a 100-psi gauge pressure for 2 hours. During this test- ing, there was no leakage over the entire 35,000 feet of PVC pipe. This result is thought to be testimony to the excellent work of Pipeline, Inc. and to the overall high quality of the PVC pipe. The project was a tremendous success for all parties involved. A portion of this project consisted of •, ,, ·,. ' .. , l I ·. } At.'· ,. _ -:·I-;·. i'V}l ';' .. •/t , 1 ·' .. 1.~. ~J-, ,..~":r / ~ /"l F-,:--- i!_,.; ,. ' ~ 18 9 1 •J.f. ,?~ ·~ ). - . ·.. • ., ·, ·.~ l··• ,.. r .. · . . d"-. ,,- \:,'., ·.\:·_ ·... ,,.·1 •· l l.~ , ·i,!V ! -.· ' "-:--t/,;.'f! t -- -~,.-,.. . ,_ -,.: . . y 'f _ _ '"I. '· .. <?. I_., ... • : .. f ., 1· 1' . > ,'~ ,. 't':"" u 1 , l. - ~ J .1 I i■ · --- ,~ I y l Master . ,·-. ,.. ·-1-,1 ' ,' , \ , ~l I I constructed ~ ~ . ~- Contract 2 was awarded in Septem- ber 1996 to the low bidder, Pipeline, Inc. (of Pinellas County), from Winter Park, Florida. The total bid amount of $6,260,392 included $4,507,800 for the PVC force main portion. I ~ 'to.. easement ~-\ . ~- easements Pictured from left to right: J oe Margio, Glace & Radcliffe, Inc.; Stu Stew art, Consultant to Pipeline Inc.; Christopher Brooke, Orange County; Steve Sloan and Sally Stew art, Pipeline Inc.; and Frank Porter, Porter Associates. Pipe was delivered from the factory by trucks and railcar. Pipe delivered by owners and

More Related