1 / 3

How to Build a Commercial Metal Building

Constructing a Commercial Metal Building is not only cost-effective but also it has long-term sustainability in terms of structure life. Its application ranges from airport hangars, storage facilities, warehouses to Industrial, Agricultural and religious as well as educational buildings.<br>

Télécharger la présentation

How to Build a Commercial Metal Building

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to Build a Commercial Metal Building Constructing a Commercial Metal Building is not only cost-effective but also it has long-term sustainability in terms of structure life. Its application ranges from airport hangars, storage facilities, warehouses to Industrial, Agricultural and religious as well as educational buildings. The main reason for such demand is because of its time-saving processes. The selection of reputed commercial metal buildings manufacturer determines the success rate of your project. As their workmanship and procedures for construction determine the cost as well as the time required to complete the project.

  2. Parameters to consider before hiring Steel building Contractor •Talk to the person who has already built the steel building, avoid interacting with more number of persons. •Online research for best contractors available in the market, their experience as well as their portfolio must also be evaluated. •Prepare a questionnaire to ask the contractor as per your project and your likings •As per the Federal Trade Commission, contractors who only prefer cash payments pressurizes you in making vague decisions and prefers to have used up materials from previous projects to use in your project are scammers. •Some contractors never prefer to have a written agreement before commencement of work. No matter what you must also have a written agreement with them defining your scope of work and other important aspects of your project.

  3. Phases of Construction •Design Phase: Some contractors design as well as build. The only difference that it is going to make is that if you opt for different contractors for design and construction it would add up to your cost. •Manufacturing: According to your design, the contractor is going to do the necessary prefabrication works making it ready for deployment. Prefabricated or Pre-engineered buildings Prefabrication of steel structures before deployment to the site saves a lot of time. This phenomenon is also called Pre-engineered buildings. This is one of the main activity in the construction of the steel building. •Site preparation: All the necessary foundation as well as Ground improvement works, need to be carried out as per the design. Awaiting the prefabricated members to arrive for its erection as well as its accumulation. •Framing: In order to accumulate the prefabricated members, necessary welding, as well as bolting, are done at the site. •After the frame is created it is covered up with the necessary wall panels as well as roof cladding. Make sure your contractor installs weather protection devices and sheets on roof coverings. •After your building is ready, necessary fittings of electrical as well as plumbing accessories will take place.

More Related