An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIFI Calibration Overview Frank Helmich HIFI in-orbit calibration manager

  2. Overview • Calibration Review • RID answers • Specific cases • Ground-based preparation • PV plan

  3. Calibration Review • Review held last year • 28 RIDs were accepted • All were answered at the end of January either closed or a plan is made to close the RID • The report was very favourable concerning the strategy and documentation

  4. RID answers • Almost all RIDs are closed • Difficult cases: • Removal of standing waves through deconvolution methods: is under study this year • Direct detection response of HEBs: It looks like this can be determined to about 1% accuracy in the lab with a narrow-band filter • How can models of Solar System Objects be cross-checked? – Will be part of the Herschel calibration workshop in December • Absorption tests are requested, but there is no hardware and no tests planned • Updating documentation and tracking of priorities is slow because of man power problems

  5. Ground-based preparation • Asteroid measurments have been made with CSO SHARC II at the end of last year • Weather was not optimal but the consequent measurement series of planet –asteroids –planet – etc. shows that a high internal accuracy can be reached • The rest of the asteroid program we leave to PACS/SPIRE and the ground-based observatories themselves • We still need measurements of about 6-12 AGB stars (CO 6-5) in the South for standard spectra: Does APEX provide opportunities?

  6. PV plan • This year the Performance Verification plan will be written • First estimate of time is hopefully available before summer. First issue must be present before the end of the year • PV will take place after check-out and engineering – The instrument works at the start of PV • Most is already written down in the frame work and the Use Cases: Ordering and filling in missing details to be done • Manpower may be an issue this year