1 / 23

August 28, 2013

WIS100 InSync Adaptive Signal Study. A full-service, multidisciplinary transportation firm dedicated to superior quality in meeting our client’s vision. August 28, 2013. 1. Project Vicinity. Project Area. Six Signalized Intersections: Walnut Road North Avenue Meinecke Avenue

vala
Télécharger la présentation

August 28, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WIS100 InSync Adaptive Signal Study A full-service, multidisciplinary transportation firm dedicated to superior quality in meeting our client’s vision. August 28, 2013 • 1

  2. Project Vicinity

  3. Project Area • Six Signalized Intersections: • Walnut Road • North Avenue • Meinecke Avenue • Middle Mall Entrance • Center Street • Burleigh Street

  4. Signal System Prior to InSync • Actuated-coordinated signal system • Optimized in December 2012 using Synchro software • Free mode outside of TOD Operation Signal System Operation

  5. InSync System • Real-time adaptive signal system • WIS 100 intersections combined video detection system with existing stop bar detection devices • Measures and responds to delay and demand at each intersection • Creates green tunnels to send platoons of vehicles through corridor

  6. Goals for InSync System • Adaption of the system to variable traffic patterns and conditions • Travel time and stop reduction on the main line • Delay reduction on side streets and left turns

  7. Lessons Learned • Establish a team of experts in the areas of system design, purchasing, communication/IT, installation, operation, and evaluation • Maintaining and encouraging proactive communication between project team members to evaluate progress and identify potential challenges • The IT network and programming was critical. • Review and shop testing of the components to be installed • Documentation of the process and preparation for interested parties to seek information from WisDOT • Involvement and working closely with Rhythm Engineering’s engineers after installation to calibrate and review operations was critical.

  8. Data Collection Efforts • Floating Car Travel Time Runs • Intersection Delay Studies • Intersection Turning Movement Counts • Fuel & Emissions • Bluetooth

  9. Effects on Data Collection • Construction on WIS 100 at south end of project • Construction on Capitol Drive • Weather Conditions • Holiday Shopping Season (December)

  10. Travel Time Run Stops & Delay Study Stops

  11. Fuel Economy & Emissions

  12. Travel Time Runs & Bluetooth Travel Times

  13. Bi-Directional Decrease in Travel Time -18%

  14. Floating Car Travel Time Run Average Profiles

  15. Increase in Travel Time + 12%

  16. Weekday Traffic Counts

  17. Saturday Traffic Counts

  18. Side Streets North Avenue Burleigh Street • Bluetooth Travel Times: • 10 s increase (14%), WB, PM • No other increases observed • Bluetooth Travel Times: • 5 s increase (7%), WB, AM • 19 s increase (19%), EB, PM • 6 s increase (8%), WB, PM • Delay Study Measured Delay: • 8 s decrease (-17%), WB, Midday • No change, EB, PM • Delay Study Measured Delay: • 7 s increase (22%), WB, AM Midday Decrease PM Increase PM Increase AM & PM Increases No Change Observed

  19. Illustrative Benefit to Cost Analysis • Values for Benefit Calculations: • 33,500 total trips per day • Average travel time savings: 28 seconds/trip • Average fuel savings: 0.008 gallons/trip • Average price of gallon of gasoline: $3.605 • Value to time for auto drivers: $10.34 • Value of time for commercial drivers: $22.78 • Real discount rate for economic analysis calculations: 2.50%

  20. Conclusions • Bi-directional decreases in travel time during the PM period • Decreased travel times in the SB direction all three periods studied • Decreased delay and number of stops on WIS 100 during travel time runs • 12% improvement in fuel economy and corresponding improvements in calculated emissions • Minor changes (minimal impact) in travel time and delay on side streets

  21. Measurement of Goals for InSync System • Adaption of the system to variable traffic patterns and conditions • Improvements despite construction & some volume increases • Travel time and stop reduction on the main line • Bi-directional decrease in travel time and stops, PM period • Delay reduction on side streets and left turns • Some increase in side street delay, minimal overall • Not enough data on left turns • More data collection recommended

  22. Recommendations & Next Steps • Checking of results after construction on WIS 100 is completed • Additional data collection and analysis • Additional traffic count times (weekday peaks and weekends) • Additional side street delay studies • Comparison of InSync system counts to manual traffic counts • Analysis of intersecting arterials (dual coordination) • Automated, continuous data collection and reporting of performance measures via a central system

  23. Questions & Discussion ?