An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trigger UpgradesIntroduction and International Perspective Norman Gee ATLAS-UK Upgrade Annual Review RAL 10-May-2011

  2. Overview • Trigger in ATLAS • ATLAS TDAQ Management Structure • TDAQ R&D for Upgrade • General Comments

  3. Trigger & Data Acquisition - TDAQ • Treated in ATLAS like another detector system • Possibly the largest - 74/174 institutes • Responsibilities • Level-1 Trigger • High-Level Trigger = Level-2 + Event Filter • DAQ: Data collection, movement, recording • Includes ATLAS control room • Detector Control System (voltages, ...) • ATLAS TDAQ management • Trigger/DAQ Management Team - TDMT • Trigger PL & DAQ PL, alternate on ATLAS EB • TDAQ Steering Group • TDAQ Institute Board • For upgrade: “TDMT+3” • N Gee, N Konstantinides, S Demers (Yale)

  4. TDAQ Steering Group • TDMT • LVL1 • L1Calo; L1Muon (Barrel and Endcap); Central Trigger Processor • HLT/DAQ • DAQ/HLT Coordinators • Trigger • Includes John Baines (Trigger Coordination Group) • TDAQ Upgrade • Norman Gee , Nikos Konstantinidis (“TDMT+3” ) • Ex-officio • TDIB Chair , Resources coordinator, other ATLAS areas • Atlas management – deputy spokesman normally attends

  5. Context of TDAQ Upgrade R&D • 21 upgrade activities already approved by (previous) USG in ATLAS • Many have TDAQ implications. Key ones for TDAQ are • Inner Detector (relationship to L1 track trigger); • Muon Spectrometer and Electronics (relationship to L1 muon trigger); • FTK – Hardware Track Finder (a TDAQ project; relationship to HLT); • LAr and Tile Calorimeter electronics (relationship to L1 calo trigger) • TDAQ (covers all TDAQ upgrades in Phases I and II) • All ATLAS-UK Trigger Upgrade work is included here • Two key documents expected within the next 6 months • Level-1 Trigger Technical Proposal • Covers Phase I + Phase II (in less detail). S Hillier chairs ed board, +3 UK • ATLAS Upgrade LoI • Also covers all upgrade phases. N Gee ed board for TDAQ

  6. Context evolution since original ATLAS-UK Upgrade Bid • FTK (fast tracker) project approved to proceed to TDR stage • Requires simulation from HLT to show benefits; • Availability of tracks at HLT input implies evolution in HLT strategy • Preferred L1Track trigger uses ”seeds” from calo and muon triggers • Implies two-level L0A/L1A hardware trigger, L0A (to provide seeds) and L1A (using L1Track information to read out full detector) – details to be worked through with all detectors • LAr and Tile calorimeters propose pilot test of on-detector digitisation • A Trigger slice was already proposed in UK, but now L1Calo/Lar/Tilecal need to work on common timetable for tests • L1Muon Trigger – latency issues • Trigger latency studies initially to look at Phase I L1A trigger latency with topo processor reveal various problems for muon detectors – Phase II trigger architecture is needed to design Phase I electronics

  7. Comments - Conclusions • TDAQ is treated like a detector – but not quite • TDAQ is normally expected to provide a service for testing even during beam down time, and even while upgrades are underway on the TDAQ system itself; full TDAQ down time is very hard to schedule • Many changes are applied incrementally – e.g. the recent addition of the Missing-ET significance trigger. Some institutes regard these as M&O, some as upgrade • Scheduling of trigger upgrades has to match detector upgrades, not only the LHC Luminosity plan • Trigger upgrades provide benefit from the day they are installed