1 / 39

Duke Energy Ohio 2012 Electric Security Plan

Duke Energy Ohio 2012 Electric Security Plan . Duke Energy Ohio June 29, 2012 Jim Ziolkowski, Rates Manager. Agenda. Duke Energy Ohio Electric Security Plan Standard Service Offer (ESP-SSO) and Distribution Rates Overview of ESP Auction Generation Riders Other Items

varen
Télécharger la présentation

Duke Energy Ohio 2012 Electric Security Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Duke Energy Ohio2012 Electric Security Plan Duke Energy Ohio June 29, 2012 Jim Ziolkowski, Rates Manager

  2. Agenda • Duke Energy Ohio Electric Security Plan Standard Service Offer (ESP-SSO) and Distribution Rates • Overview of ESP • Auction • Generation Riders • Other Items • Transmission (Not Part of ESP) • Move to PJM • New Riders • Price To Compare

  3. ELECTRIC SECURITY PLAN OVERVIEW • Duke Energy Ohiofiled a 9-year 5-month Electric Security Plan (ESP) in June 2011. The previous ESP terminated after December 31, 2011. • Settlement was reached in October 2011 with intervening parties. • Hearing held during November 2011. • ESP was approved by the PUCO in November 2011. • ESP effective January 1, 2012, through May 31, 2015.

  4. ELECTRIC SECURITY PLAN OVERVIEW • Major rate provisions of the new ESP include: • Retail generation Standard Service Offer load to be procured through an auction. The cost of this auction-procured load will be recovered through Riders RC and RE. True-ups addressed through Rider SCR. • DE OH will move its legacy generation plants to a non-regulated affiliate by 12/31/14. • DE OH will collect $110 million per year for three years through a new non-bypassable charge (Rider ESSC). • All previous generation-related charges terminated after December 31, 2011 (base generation, FPP, AAC, SRT, CD, shopping credit).

  5. AUCTION schedule 5

  6. Details of Auction • First auction held on December 14, 2011. • Three products: • January 2012 – May 2013 • January 2012 – May 2014 • January 2012 – May 2015 • Descending-price clock auction • Charles River Associates was the auction manager. Boston Pacific monitored for the PUCO. • Auction was for capacity and energy. • Blended auction price was $52.68 per MWh for the January 2012 through May 2013 delivery period. 6

  7. Auction Schedule 7

  8. 2012 electric security planRate structure and impacts

  9. GENERATION RATES - 2012 • The Price To Compare (bypassable) components of the ESP-SSO are: • Rider RC (Retail Capacity) • Rider RE (Retail Energy) • Rider SCR (Supplier Cost Reconciliation) • Rider AERR (Alternative Energy Recovery) • Rider RECON (Reconciliation Rider) • Rider RTO (Regional Transmission Organization) • Other Generation-related riders that are non-bypassable: • Rider ESSC (Electric Security Stabilization Charge) • Rider LFA (Load Factor Adjustment) • Rider UE-GEN* (Uncollectible Expense – Generation) * Bypassable if CRES opts out of PAR

  10. Old ESP to 2012 ESP Rate Changes – Non-Residential • RC and RE • Retail Capacity and Energy • Derived from auction • PTC - BG • Base generation • SCR • Supplier Cost Reconciliation • PTC – AAC • Environmental • Homeland Security • Taxes • AERR • Alternative Energy Recovery RECs • PTC-FPP • Fuel, Purchased Power, Allowances • RECs RECON Reconciles ESP riders • Rider RTO • Various RTO costs • SRA-SRT • System Reliability • BTR • Base transmission incl. NITS • SRA-CD (Rider SC) • Capacity Dedication • ESSC • Electric Security Stabilization • Rider TCR • MISO Transmission UE-GEN Generation Uncollectibles Legend Distribution rates and riders Fully Avoidable • LFA • Load Factor Adjustment Avoidable with waiver Distribution rates and riders Unavoidable 10

  11. Old ESP to 2012 ESP Rate Changes – Residential • RC and RE • Retail Capacity and Energy • Derived from auction • PTC - BG • Base generation • SCR • Supplier Cost Reconciliation • PTC – AAC • Environmental • Homeland Security • Taxes • AERR • Alternative Energy Recovery RECs • PTC-FPP • Fuel, Purchased Power, Allowances • RECs RECON Reconciles ESP riders • Rider RTO • Various RTO costs • SRA-SRT * • System Reliability • BTR • Base transmission incl. NITS SRA-CD Capacity Dedication • ESSC • Electric Security Stabilization • Rider TCR • MISO Transmission UE-GEN Generation Uncollectibles Legend Distribution rates and riders Fully Avoidable • LFA • Load Factor Adjustment Avoidable with waiver * Conditionally avoidable only for aggregation customers Distribution rates and riders Unavoidable 11

  12. RIDER RC (RETAIL CAPACITY) • Based on PJM RPM market capacity price for the delivery period. • Converted into retail rates. • Rider RC will be adjusted before each of the three delivery periods in the ESP. • Rider RC is fully avoidable by shoppers.

  13. RIDER RE (RETAIL ENERGY) • At the wholesale level, calculated by subtracting the capacity price for the delivery period from the blended auction price. • Converted into retail rates by adjusting for losses, taxes, and seasonality / blocks (for some rates). • Rider RE will be adjusted before each of the three delivery periods in the ESP. • Rider RE is fully avoidable by shoppers.

  14. RIDER ESSC (ELECTRIC SECURITYSTABILIZATION CHARGE) • Collects $110 million per year for three years. • Expires after 12/31/14. • Will be trued up each year. • Rider ESSC is non-bypassable.

  15. RIDER SCR (SUPPLIER COST RECONCILIATION) • Reconciles the Rider RE and Rider RC revenues received from retail customers with the payments owed to auction providers. • Recovers costs associated with auctions (e.g., consultants, setting up CBP website, etc.) • Will be adjusted quarterly. • Normally bypassable for shopping customers, but Rider SCR contains a non-bypassable provision.

  16. RIDER SCR (SUPPLIER COST RECONCILIATION) – “Circuit Breaker” • Subject to Commission approval, Rider SCR becomes applicable to all retail jurisdictional customers in the Company’s electric service territory including those customers taking generation service from a CRES provider under the following circumstance: • The revenue balance within the SCR account becomes equal to or greater than ten percent of the Company’s total actual SSO revenues collected for the most recent twelve month period under Riders RE, RC, RECON, RTO, and AER-R. The total actual SSO revenue will be determined from data covering the most recent quarter for which it is available. • Duke Energy Ohio shall apply to the Commission for confirmation that the Company should modify the Rider such that it becomes non-bypassable regardless as to whether or not the balance in the Rider results from over- or under-recovery. • For customers of CRES providers, Rider SCR will become bypassable again when, at the time of the quarterly filing, the Rider balance of over- or under-recovery falls below the ten percent threshold.

  17. RIDER AERR (ALTERNATIVE ENERGYRECOVERY RIDER) • Recovers the cost of RECs associated with Standard Service Offer (i.e., non-switched) load. • Will be adjusted quarterly. • Rider AERR is fully avoidable by shoppers.

  18. RIDER RECON (RECONCILIATION RIDER) • Rider RECON recovers costs necessary to true up revenue collected under Rider PTC-FPP and Rider SRA-SRT with actual costs associated with each of these two riders through December 31, 2011. • Rider RECON will terminate when the net over- and/or under-recovery balances for Rider PTC-FPP and Rider SRA-SRT are eliminated but no later than two quarters after the filing of a final entry in the docket initiated by the Commission for purposes of conducting a final audit of Rider PTC-FPP and Rider SRA-SRT. • Rider RECON is fully avoidable by shoppers.

  19. RIDER UE-GEN (UNCOLLECTIBLEEXPENSE - GENERATION) • Recovers uncollectible accounts expense related to generation service including Percentage of Income Payment (PIPP) customer installments not collected through the Universal Service Fund Rider. • Non-bypassable except it is bypassable for accounts that are not designated for Duke Energy Ohio’s Purchase of Accounts Receivables program. • Will be adjusted annually.

  20. RIDER LFA (LOAD FACTOR ADJUSTMENT RIDER) • Revenue neutral to Duke Energy Ohio. • Will be adjusted quarterly. • Rider LFA is non-bypassable. • Rider LFA applies to customers taking service under Rates DS, DP, and TS. • Demand charge and kWh credit.

  21. OTHER ITEMS • Minimum stay rules eliminated for all customer classes. • DE OH received approval to sell its generation plants to a non-regulated affiliate. • Duke Energy Ohio will purchase accounts receivables from CRES providers at zero discount • Rider LM has been re-opened to both shoppers and non-shoppers • Funding provided to various community agencies serving low income customers. • Filed an application in December for a new Distribution Decoupling Rider. Will not apply to DS, DP, and TS.

  22. TYPICAL BILL IMPACTS – RATE DS

  23. TYPICAL BILL IMPACTS – RATE DP

  24. TYPICAL BILL IMPACTS – RATE TS

  25. Alternative Energy, Energy Efficiency, Peak Demand Reduction • ESP will not impact commitment to meeting alternative energy, energy efficiency, or peak demand reduction requirements. • Duke Energy Ohio currently acquires RECs to meet alternative energy requirements. • Duke Energy Ohio will continue to purchase RECs and also enter contracts to comply with alternative energy requirements. • Duke Energy Ohio will continue energy efficiency and peak demand reduction programs. 25

  26. ESP TERMINATION • The Electric Security Plan will be effective through May 31, 2015. • The Company is required to make its next ESP filing by June 1, 2014.

  27. TRANSMISSION RIDERS 27

  28. RTO Membership • Duke Energy Ohio received FERC approval to realign RTO membership with PJM. • Realignment effective January 1, 2012. • Auction timeline designed to coordinate with PJM planning year. 28

  29. Rider BTR and Rider RTO • Rider TCR (Transmission Cost Recovery) terminated after December 31, 2011. Rider TCR was bypassable for shoppers. • New transmission riders effective January 1, 2012: • Rider BTR (Base Transmission Rider). Non-bypassable, i.e., no longer part of the price to compare. • Rider RTO (Regional Transmission Organization Rider). Fully bypassable. Currently zero.

  30. Old ESP to 2012 ESP Rate Changes – Non-Residential • RC and RE • Retail Capacity and Energy • Derived from auction • PTC - BG • Base generation • SCR • Supplier Cost Reconciliation • PTC – AAC • Environmental • Homeland Security • Taxes • AERR • Alternative Energy Recovery RECs • PTC-FPP • Fuel, Purchased Power, Allowances • RECs RECON Reconciles ESP riders • Rider RTO • Various RTO costs • SRA-SRT • System Reliability • BTR • Base transmission incl. NITS • SRA-CD (Rider SC) • Capacity Dedication • ESSC • Electric Security Stabilization • Rider TCR • MISO Transmission UE-GEN Generation Uncollectibles Legend Distribution rates and riders Fully Avoidable • LFA • Load Factor Adjustment Avoidable with waiver Distribution rates and riders Unavoidable 30

  31. PRICE TO COMPARE2012

  32. How Do I Calculate My Price to Compare? • Compare: • DE OH’s Rider RC Charge • + Rider RE Charge • + Rider SCR Charge • + Rider AERR Charge • + Rider RECON Charge • + Rider RTO Charge • vs. • The CRES Provider’s price for electricity • Note: Price To Compare varies based on load factor

  33. Load Factor • Load Factor: • kWh used during the month • divided by • hours in the month x monthly demand • Impact: • The higher the load factor, the lower the rate per kWh • The lower the load factor, the higher the rate per kWh

  34. Price To Compare Calculation

  35. Price To Compare Calculation

  36. Recommendations • Use twelve months of demand and energy to develop an “average annual price to compare” for the best price comparison • Compare competing offers using the same usage data

  37. Annual Price To Compare (Example)

  38. Duke Energy Ohio Tariffs • DE OH’s tariffs can be found online at: www.duke-energy.com

  39. DE OH Standard Service Offer Questions?

More Related