An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Road Maintenance with Geosynthetics K.Boychev

  2. Crack Appearance on Bituminous Roads- Reflective Cracking- Thermal Cracking- Differential Settlements- Frost Heave(- Rutting)

  3. Crack Appearance on Bituminous Roads(e.g. Differential Settlements)

  4. Crack Appearance on Bituminous Roads(e.g. Differential Settlements)

  5. Paving Product Matrix Paving Products SAMI / reflective cracking “Stress Absorbing Membrane Interlayer” Asphalt reinforcement Non-woven Continuous filament Geocomposites Geogrids Non-woven Staple/short fiber Glass PET Coated/ Uncoated PP/PET nonwoven + Glass Uncoated PP or PET

  6. PGM is a mechanically bonded continuous filament nonwoven of 100% Polypropylene with optimum bitumen retention capacity. (EN 15381 or acc. Texas D.O.T Item 3099) PGM • Reflective Cracking (STR) + Seals the surface (B) Literature: EN 15381 PGM-G is a high strength geocomposite, PGM + alkali resistant glass fibre reinforcement Group 2 PGM-G30/30 E PGM-G50/50 E PGM-G100/100 E Group 1 PGM-G50/50 PGM-G100/100 PGM-G150/150 • Reflective Cracking(STR)+Seals the surface(B)+Reinforcement(R) Literature: EN 15381

  7. Road Construction – General Location of PGM, PGM-G & PGM-G E Literature GESTRATA Handbook Sep.2002

  8. Road Construction – Stress Relieving Layer Conventional Method Stress relieving layer thickness up to 90mm thickness! Bore Cores Taken from Hungarian Highway!

  9. Road Construction – Stress Reliefe Layer (SAMI) PGM and PGM-G Method Bore Cores Taken from Hungarian Highway!

  10. Applications (1) Bituminous Overlays Hot Rolled Asphalt (2) Surface Dressing PGM 14 PGM-G & E Grades PGM 14 only

  11. Typical Crack Growth Bituminous Overlay Bituminous Overlay Crack Growth PGM & PGM-G Thermal expansion and contraction Subbase

  12. Increases the Life Time TenCate PGM & PGM-GStress Relief Layer (SAMI) Stress Concentration! Stress Reduction!

  13. Working Procedures (1) Cleaning the road surface (2) Filling of the potholes and cracks (>3mm) with bitumen On highly damaged roads a levelling layer is recommended

  14. Working Procedures (3) Tack Coat Spray Pour Bitumen or Emulsion Quantity >1.1 kg/m² Bitumen (PGM-G) Quantity >0.4 kg/m² Bitumen (PGM-G E) High Viscosity > 65% Bitumen Content (4) Paving Geocomposite or Paving Fabric Installation - Installation device (recommended) - no folds - no overlapping required

  15. Working Procedures a) Bituminous Wearing Coarse • after the PGM & PGM-G installation • possibility of temporary trafficking b) Surface Dressing • After Installation of Geosynthetics • tack coat spray • - Application of chipping

  16. (1) Working Procedures – Bituminous OverlaysInstallation of PGM & PGM-G products • Apply asphalt layer after the installation of PGM & PGM-G products • Pavers on tracks is recommended • Installation temperature between 120°C to 165°C, depending on layer thickness • If the tyres are sticking: Spread asphalt in the wheel tracks

  17. Example – Installation of asphalt overlay

  18. (2) Working Procedures – Surface DressingInstallation of PGM • Application of tack coat to existing pavement installation of PGM; 2nd. application of tack coat 0,8 kg/m² emulsion • Volume of emulsion, amount and grading of chipping, in accordance with guidelines for surface dressing • Immediately after 1.chipping layer rolling necessary • In case of 2 or more chipping layers, a sufficient bonding is required between the layers • After 1-3 days test driving the unbounded chips has to be removed

  19. Example of Surface Dressing(A143, Bungay Norfolk UK) Road Surface before treatment 6mm surface dressing being applied on PGM 14

  20. Hot Rolled Asphalt (e.g. 4 or 5cm) is COSTLY! Project Introduction Mrozow/Poland July 2008 Surface Dressing with PGM14 Access Road on countryside Actual Problem

  21. Requirement of Quality Paving GeocompositesPrevention of Reflective Cracking + Asphalt Reinforcement TC PGM-G Benefits Crack Relief (STR) Sealing (B) Reinforcement (R) Literature: EN 15381 Elongation of Asphalt Concrete approx. 0,1% 0°Grad approx.2% 20°Grad

  22. Paving Geocomposites (E - Types)PGM-G30/30 E Rehabilitation of Asphalt Roads PGM-G50/30 E PGM-G100/100 E Elongation of Asphalt Concrete approx. 0,1% 0°Grad approx.2% 20°Grad

  23. NEWPaving Geocomposites for Road Extentions

  24. Functions according EN 15381 –Geotextiles and geotextile related productsR + STR + B R=reinforcement = reinforce the bituminous layer, stopping and controlling the cracking process STR= stress relief = function provided by a bitumen-saturated paving fabric (non-woven or purpose-built composite) which, when is properly installed between a road surface and a new asphalt overlay allows for slight differential movements two layers and thus provides stress relief, which delays or arrests crack propagation in the asphalt overlay B= interlayer barrier = function provided by paving fabrics, which act in conjunction with a bitumen layer as a barrier to the ingress of water and thus prevent or delay the deterioration of the pavement

  25. SealingPermeability Conventional Method vs. PGM& PGM-G (140g/m² nonwoven) The non-woven works as Bitumen Storage. The sprayed bitumen will kept in place. Conventional constructions Water Permeability Reduction from 10-1 to 10-5mm/sec PGM Application Literature: Transportation Research Center by M. L. Marienfield and T. L.Baker

  26. Vertical loading (amplitude 0.2 mm) Horizontal Frame loading (0,6 mm/h) 6 Overlay Crack Detektors ] PGM 14 m 5 c Crack Asphalt Concrete [ Base plate with PGM without PGM 4 h t Frame p 3 e d 2 k c a 1 r C Time [min] 0 100 200 300 400 500 600 Polyfelt PGM 14- Flexural Fatigue Test 1m

  27. Steel Plate Steel Plate P P Applied Load: 890N Asphalt Type: AC20 Thickness: 5cm Beam: 7,5cmx7,5cmx61cm Rubber Rubber 50 25 Notch 3mm Notch 3mm Rubber Foundation Rubber Foundation ESAL =no of cycles in 1.000 PGM ESAL =no of cycles in 1.000 FatigueTest Data(prepared by Resource Int, Ohio) – at 20°C Result Fatigue Data: C-1 11.800 C-2 10.076 C-3 12.084 FEF - Applied Load: 890N Asphalt Type: AC20 Thickness: 5cm Beam: 7,5cmx7,5cmx61cm Product Type:PGM 14 Tack Coat: 0,9 kg/m² Result Fatigue Data: F-1 20.850 F-2 16.976 F-3 18.564 50 FEF 1,7 25

  28. Steel Plate Steel Plate P P Rubber Rubber Notch 3mm Notch 3mm Rubber Foundation Rubber Foundation ESAL =no of cycles in 1.000 PGM PGM Fatigue Test Data (prepared by Resource Int, Ohio) – at 20°C Applied Load: 890N Asphalt Type: AC20 Thickness: 5cm Beam: 7,5cmx7,5cmx61cm Product Type:PGM 14 Tack Coat: 1,1 kg/m² Result Fatigue Data: F-4 24.826 F-5 31.637 F-6 29.387 FEF 2,6 50 25 Applied Load: 890N Asphalt Type: AC20 Thickness: 5cm Beam: 7,5cmx7,5cmx61cm Product Type:PGM 14 Tack Coat: 1,3kg/m² Result Fatigue Data: F-7 48.117 F-8 46.846 F-9 49.587 50 FEF 4,3 25 ESAL =no of cycles in 1.000

  29. Analysis of the tests (Faculty Polytechnico Milano/Italy – Four Point Beam test 2008) Message 1 Message 2 Message 1: Cycle Increaseatthe same lossofelasticmodulus (%) Message 2: With same loadcyles an increaseofbearingcapacityof 25% will beachieved

  30. Road Rehabilitation 2003/ Trento/Italy

  31. Bridging – Effect of used paving fabric

  32. Spraying of Tack coat Complete Bitumen Spraying required

  33. Installation of PGM-G products

  34. Bituminous Overlays approx. 10cm lateral distance

  35. Installation side by side laying (butt joint) ….ready for the asphalt layer application…

  36. Installation of PGM 14 on Cement Stab. Layer - 3,5 cm SMA11 LKI (´05) - 12,0 cm BT32 LKI - TenCatePGM 14 - 1,9 kg/m² O70 K PM - Evaporation Protection - 30 cm Cement Stab.

  37. Factors of success • Installation Support & Installation Equipment Manual Equipment for max 1,90m width (expandable) Equipment for max 3,80m Mounted on excavator, Bobcat, etc.

  38. Factors of success • Usage of products which can get trafficked

  39. 2 Years Research Project - TU-Vienna Finalization of all tests by end of 2009 a) Installation of geosynthetic interlayers commencing April 2008(3 groups Geotextiles, Geocomposite, Geogrids & Conventional Section) b) Subsequently Trafficking for 3 month on the test area(Teerag Asdag in Vienna) c) Drilling of 350 bore cores on the site by end of June 2008 by “MAPAG” d) Start wedge splitting test of taken bore cores of the site in September 2008 by TU Vienna.

  40. 2 Years Research Project - TU-Vienna Group 1: function = stress absorbing membrane interlayer (SAMI) Group 2: function = Asphalt Reinforcement

  41. Group 3: function = Geocomposite SAMI + Asphalt Reinforcement

  42. WedgeSplitting Test [Tschegg 1986] • Fracture mechanic properties obtained • Cubes from Drilling cores • Interface (Geosynthetics) in the middle of the specimen • Splitting energy in the specimen, Starter notch crack control • FH = FM /(2tg(α/2)) … α=angle of wedge • FVsmall compared to FH

  43. WST – Evaluation of results σNTS .... notch tensile strength [MPa] FH max ... max. splitting force [N] A ......... ligament area [mm²] Mb ....... bending moment [Nmm] Wy …... axial section modulus [mm³] GF .... spec. fracture energy [J/m²] A …... ligament area [m²] FH …. horizontal force [N] s ....... CMOD [m]

  44. Fracture crack growth behavior • Reference: low energy  fast crack growth • Non performing Interlayer: low resistance against crack growth • Well performing Interlayer:  no crack growth • Geosynthetics takes over the force even the CMOD is more than2mm • fracture at -10°C, 0°C, +10°C

  45. Large scale test pit  Installation

  46. Large scale test pit  Specimen Drilling core + interlayer      

  47. 2 Years Research Project - TU-Vienna • Methods for the evaluation of the crack growth • Electrical Device • Optical Device • Acoustical crack evaluation Screenshoot Webcam

  48. 2 Years Research Project - TU-Vienna Cooling Equipment with in Integrated testing machine Test Equipment with Cooling box (Test Temperatures at -20°C, 0°C, +20°C)