1 / 25

RedIRIS-NOVA real experiencies of tendering and deploying an optical network in Spain

RedIRIS-NOVA real experiencies of tendering and deploying an optical network in Spain. TERENA TF-MSP “Non-technical aspects of dark fibre” Workshop Amsterdam - 9 and 10 November, 2010. Esther.Robles@rediris.es RedIRIS Network Manager RedIRIS/Red.es. RedIRIS10 Highlights.

Télécharger la présentation

RedIRIS-NOVA real experiencies of tendering and deploying an optical network in Spain

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RedIRIS-NOVA real experiencies of tendering and deploying an optical network in Spain TERENA TF-MSP “Non-technical aspects of dark fibre” Workshop Amsterdam - 9 and 10 November, 2010 Esther.Robles@rediris.es RedIRIS Network Manager RedIRIS/Red.es

  2. RedIRIS10 Highlights... • 20 PoPs: > 13.000 km distance • 156 Gbps backbone • 43 links: 10GE, STM-16/4/1 • Leased Capacity to T-Systems and Telefonica • GEANT IP access: • 10Gbps @ ES PoP • 2.5Gbps @ FR PoP (bck) • GEANT Lambda Service: • 3 x 10Gbps E2E links • 2 Transit Providers (Madrid) • Telia and Global Crossing @ 10Gbps • IXPs presence: • ESPANIX @ 10Gbps (Madrid) – 59 peerings • CATNIX @ GE (Barcelona) – 19 peerings • Institutions Access Links • 10 GE • n x GE • FE TF-MSP “Non-technical aspects of dark fibre” Workshop.

  3. RedIRIS Users Classification other 15% R&D Centers 35% R&D Management Institutions 17% Health institutions 13% Universities 20% TF-MSP “Non-technical aspects of dark fibre” Workshop.

  4. RedIRIS Traffic Trends (PBytes) 40,5 PB around 1,45 /year 9,5 PB 2.5Gbps Backbone 10 Gbps Backbone TF-MSP “Non-technical aspects of dark fibre” Workshop.

  5. Network Resources Consumers Examp. • BSC-RES project: Supercomputing national initiative at 10Gbps • DEISA project: EU supercomputing network at 10Gbps. • LHC infrastructure support (nx10Gbps) • PASITO: Spanish experimental testbed network • RENEM (National Emergency Network): high availability and specialized support. • e-VLBI network support • ... TF-MSP “Non-technical aspects of dark fibre” Workshop.

  6. ... and telescopes in Canary Islands • 10.4m telescope with a segmented primary mirror. • Currently, the biggest telescope in the world. • http://www.gtc.iac.es/ TF-MSP “Non-technical aspects of dark fibre” Workshop.

  7. after RedIRIS10... RedIRIS-NOVA Spanish government commitment to build a photonic network based on dark fiber TF-MSP “Non-technical aspects of dark fibre” Workshop. • RedIRIS10 contracts will end in October 2011 • The historical leased capacity model does not scale for the new e-Science challenges: • no Flexibility • limitations to develop advanced functionalities • high Costs • Globally, Educational and Research Networks are evolving to a model based on own dark fiber... or, more accurate, have evolved !

  8. RedIRIS-NOVA project • 138 MM€ : EU structural + Science and Innovation Ministry + Regional Governments funds • National coverage requirements: • Penninsula and Islands ( Cannary and Balears) • Ceuta and Melilla ( Norh Africa Spanish Cities) • Competitive Dialog Tender Process helps to know the dark fiber market in Spain and to define the tender requirements: • RFI in Oct/Nov 2008 • Dialog Process: December 2008 to July 2009 • Evaluation: September & October 2009 • Tender structured in 3 lots: • Guaranteed Fiber within the penninsula and housing facilities • Guaranteed Fiber with Canary Islands and housing facilities • Optical Equipment • 25 companies applied to participate and 23 companies joined in Dialog: • 10 fiber providers • 13 equipment vendors TF-MSP “Non-technical aspects of dark fibre” Workshop.

  9. PoPs Redundancy • C1 PoP ( ): Its connection within the DF network requires a high reliability level. At least, two completely diversified routes with other two C1 PoPs • C2 PoP ( ): The realibility expectations are not so high ( not a core institution or economically not affordable) and the redundancy requirement is relaxed: ony one route required and one building access TF-MSP “Non-technical aspects of dark fibre” Workshop.

  10. Fiber Tender Results ... • Islalink fiber as Canary Islands supplier TF-MSP “Non-technical aspects of dark fibre” Workshop. • Telefónica as peninsula fiber supplier

  11. RedIRIS-NOVA fiber footprint I Iberia OpticalRing Dual FCCN opticalfiberinterconnection Splicesalready done Additional PoPs will be added TF-MSP “Non-technical aspects of dark fibre” Workshop.

  12. RedIRIS-NOVA fiberfootprint II 1.504 km 232 km 143 km TF-MSP “Non-technical aspects of dark fibre” Workshop.

  13. Guaranteed means... • Fiber Quality will be guaranteed until IRU ends: • Keep installation fiber parameters • No-complianced fiber spans will be swapped • 24/7 hot line • Supplier is responsible for end to end fiber quality ( even optical panel connector) • Optical Fiber Supervision System based on OTDR measurements, via: • A spare single fiber in same cable RedIRIS-NOVA fibers (selected) • OR • RedIRIS-NOVA fibers @ 1650nm • Housing facilities with guaranteed service: power supply, air conditioning, 24h independent access... • Classical operational model adapted to a fiber infrastructure • Integrated with new RedIRIS procedures • Failures Response Times Specification via SLAs: • Leased capacity approach adapted to a fiber infrastructure scenario • SLAs model discussed with bidders • PMD <= 0.50 ps/√km (0.20) QUALITY OPERATION MAINTENANCE TF-MSP “Non-technical aspects of dark fibre” Workshop.

  14. Failures and SLAs definition ... • Failures classification • Complex Failures ( CF): Fiber outages or degradations that require special (≈ long) works to be fixed • Normal Failures ( NF): no special works • Service Level Agreements (to Fiber Links) • Fiber Link Availability (monthly): 99.2% just for NF times • PoP Availability (monthly): 99.98%, both CF + NF • Mean Times between Failures : 180 days (365 subm. )for CF and 30 days for NF • Maximum Unavailability Time for CF per 12 months periods: 30 hours for each 1.000km of fiber. • Time to Repair: 12 hours (20 days subm.) for CF and 8 hours (10 days subm.) for NF • Frequency of Failures (measured over 12 months periods): • 3 for CF and 6 for NF. • Fiber spans would be swapped if threshold is reached. Fiber Link (includes even the connector at RedIRIS optical panel) Fiber span Fiber span PoP PoP ILA TF-MSP “Non-technical aspects of dark fibre” Workshop.

  15. SLAs penalties ... • Deployment phase • Delays in deployment • Operational phase • ILA housing conditions failures • No collaboration with 3rd party entities • Fiber link unavailability • PoP unavailability ( simultaneous outage or degradation for all PoP fibers) • To exceed Meant Time Between Failures parameter for each fiber link • To exceed the Maximum Number of CF per 12 months periods • To exceed the Maximun Time to Repair • Improper fiber operations • How are penalties charged with an up-front payment model ? • Provider set up a “1% contract budget” bank guarantee to support those penallties. • The 1% bank guarantee should be kept until IRU contract ends. Provider must put back money when any penalty reduce it. TF-MSP “Non-technical aspects of dark fibre” Workshop.

  16. RedIRIS-NOVA PoPs I • Requirements • Supply the required conditions to operate the RedIRIS-NOVA equipment (optical, data and management). Requirements depends on PoP-degree • Power Supply ( with backup power generators) • Electrical ground network • Space: ( ... and upto 600kg/rack) • Temperature and humidity... TF-MSP “Non-technical aspects of dark fibre” Workshop.

  17. RedIRIS-NOVA PoPs II • More Requirements... • Interconnection points for RedIRIS members • Physically accesible to RedIRIS staff on a 7x24 basis • Secure access • Neutral to the termination of 3rd party fibre • Technical support and remote hands • Partnership with PoP sites • Add/Drop PoPs (ROADM) site hosts are RedIRIS members • Not a commercial relationship, Win-Win model supported on service. • “Housing Agreement” • Users can interconnect to RedIRIS-NOVA directly or through a Regional Network. TF-MSP “Non-technical aspects of dark fibre” Workshop.

  18. E3 The Regional Networks (RNs) TF-MSP “Non-technical aspects of dark fibre” Workshop.

  19. To Optical Regional Networks... TF-MSP “Non-technical aspects of dark fibre” Workshop. Extend RedIRIS-NOVA fiber footprint to reach RN points. • Great opportunity to improve the RN infrastructure • Contribute to the concurrent evolution of national, regional and intercampus networks  User Service Enhacement • RedIRIS Support: As a means for regional networks to acquire and light dark fiber. • Costs: • 12.500 km of fiber with national coverage • Favorable results by aggregating demand • Agreements with Regional Governments • Current tender allows to reach 108 additional PoPs (phase I) • New tenders would be launched as needed (phase II)

  20. Optical Equipment Tender... • Virtual/logical Components Catalogue: • Optical Functionality ≈ Virtual/Logical Component • Vendors Equipment groupped and mapped their hardware list elements to each Virtual Component. • Optical network design for the working scenario based only on Virtual Components • Economical proposals include the cost for each Virtual Component: • Only Virtual Components can be bought to light the real fiber footprint TF-MSP “Non-technical aspects of dark fibre” Workshop. • List of mandatory and optional equipment functionalities. • Hypothetical fiber footprint as working scenario for all bidders • Management and Planification systems required.

  21. Optical Equipment Tender Results • Equipment and service guarantee provider : Telefonica • Service Guarantee to end 2012. • Alcatel-Lucent Equipment:1626 Light Manager Red 5.0A (6.0 update included) • WSS (Wavelength Selective Switch) technology. No O/E/O conversion. • 50 Ghz grid spacing: 93 x 10 G / 80 x 40G • 10G, 40G supported. 100G prepared to be supported when available • 8-degree ( 7x1) • Directionless and colorless support. • EDFA and RAMAN amplification • Variable Optical Attenuators (VOA) in transponders and amplifiers. • Automatic Power Equalization • Automatic Pre-emphasis Adjustment • User ports ( required by RedIRIS): 10GE, GE and OTN. • OSNCP protection 1+1 included. • OSC running at 1510nm (4 Mbps) • GMPLS support • Network Management System: 1350 OMS Rel. 5.0A • Optical Network Design Platform - ONDP Rel. 5.0A TF-MSP “Non-technical aspects of dark fibre” Workshop.

  22. Optical Equipment Guarantee... • 24/7 hot line to fix problems and technical support • Hardware Replace Time: 4 hours • Incident Time Resolution: 4 hours ( critical and high), NBD ( medium), 2 BD ( low) • Direct access to the vendor support center • 5-people operation team ( 24 hours @ RedIRIS offices) • Software Releases • Upgrade upto 2 new software releases per year  optical equipment, NMS and planification systeml • Done by supplier ( remotely or in-situ, as needed) • Preventive Tasks • Set of tasks to check the health of patch panels, fiber cords and optical equipments for all sites. • At least, one per year. TF-MSP “Non-technical aspects of dark fibre” Workshop.

  23. Optical Equipment Guarantee... • Corrective & Scheduled Maintenance Works • Reports • Technical Documentation • Complete access to the technical documentation ( even the private one): hardware, functionalities, bugs, interoperability... • Regular (quarterly) Technical Workshops to present 12 months roadmap:: hardware and functionalties. TF-MSP “Non-technical aspects of dark fibre” Workshop.

  24. RedIRIS-NOVA services • Global IPv4 and IPv6 reachability • Multicast • DNS • IPv4 and IPv6 address space management • NTP • Ethernet Layer • Wavelengths between RedIRIS PoPs: • Unprotected • Protected and/or • With Restoration • Wavelengths between Shared PoPs and/or RN PoPs: • By Type: • Unprotected • Protected and/or with Restoration • By Use: • IP Regional Network Support • Projects Support  RedIRIS community Optical Regional Networks  RedIRIS community IP services PrivateCircuits Performance Monitoring Tools TF-MSP “Non-technical aspects of dark fibre” Workshop.

  25. Edificio Bronce, Plaza Manuel Gómez Moreno s/n 28020 Madrid. España Tel.: 91 212 76 20 / 25, Fax: 91 212 76 35