1 / 9

Validation and extension of ITRF2005 for DORIS POD

Validation and extension of ITRF2005 for DORIS POD. P. Willis (IGN/IPGP), J.C. Ries (U Texas), F. Lemoine (GSFC), L. Soudarin (CLS), E. Pavlis (GSFC), N. Zelensky (SGT). SUMMARY. Goals Inputs / Outputs Example of problems (future) validation and plans Conclusion. GOALS.

vic
Télécharger la présentation

Validation and extension of ITRF2005 for DORIS POD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Validation and extension of ITRF2005for DORIS POD P. Willis (IGN/IPGP), J.C. Ries (U Texas), F. Lemoine (GSFC), L. Soudarin (CLS), E. Pavlis (GSFC), N. Zelensky (SGT)

  2. SUMMARY • Goals • Inputs / Outputs • Example of problems • (future) validation and plans • Conclusion

  3. GOALS • Control recent ITRF2005 for POD • Extend it for missing stations (new sites) • Provide metadata to POD group related to station coordinates and velocities

  4. INPUTS(DORIS station coordinates) • ITRF2005 X + V • DORISMails (IGN/SIMB = H. Fagard) • Collocation in ITRF2005 + local tie • DORIS cumulative solution (X + V) • DORIS using fixed velocity (X)

  5. OUTPUTS • Station coordinates X(epoch 2000.0) • Station velocity V • DORIS Data to delete (periods) • Station discontinuities (break/epoch/cause)

  6. DORIS stations not in original ITRF2005 • MALB RIKB • MIAB BETB • SCRB HEMB (no data) • MONB • DIOB • DJIB • ARFB

  7. Example of problems Arequipa : ARFB (velocity after the Earthquake is different) DJIB (antenna instability)

  8. (Future) validation and plans • Do POD tests using: • original ITRF2005 • Extended DPOD2005 • Individual DORIS AC cumulative • Plans for the future • April: Finalize DPOD2005 • May-June: POD validation

  9. CONCLUSIONS • No major problem found in DORIS ITRF2005 solution • Preliminary DPOD2005 frame • Validation in May-June 2007

More Related