1 / 28

MINISTERIAL IMBIZO LEPELLE-NKUMPI MUNICIPALITY

MINISTERIAL IMBIZO LEPELLE-NKUMPI MUNICIPALITY. MAYOR’S PRESENTATION TO STAKEHOLDERS 30-SEPTEMBER 2005, MALATANE VILLAGE. PRESENTATION TRUCTURE. 1. Overview of Municipality 2. Service Delivery and Infrastructure Development: - Water - Sanitation - Electricity - Refuse Removal

viet
Télécharger la présentation

MINISTERIAL IMBIZO LEPELLE-NKUMPI MUNICIPALITY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MINISTERIAL IMBIZOLEPELLE-NKUMPI MUNICIPALITY MAYOR’S PRESENTATION TO STAKEHOLDERS30-SEPTEMBER 2005, MALATANE VILLAGE

  2. PRESENTATION TRUCTURE 1. Overview of Municipality 2. Service Delivery and Infrastructure Development: - Water - Sanitation - Electricity - Refuse Removal - Housing 3. LED 4. Financial Viability 5. Municipal Transformation 6. Governance

  3. 1. Overview of the Municipality • One of the five local municipalities within Capricon district Municipality, Limpopo • Situated 60km south of the district • Divided into 25 wards, 109 villages and one township. Settlement patterns largely rural. • Population - 227 965; and 51 243 households • Occupies 3, 454.78 km square • 45% unemployment • 19.5% illiteracy rate

  4. 2. Service Delivery & Infrastructure Development 2.1 WATER SERVICES • In 2001 23 519 households had access to water at RDP standards • Currently 34 324 households have access to water at RDP standards • Nine villages without adequate water (HP) • R25.9 million budgeted to provide water in the current financial year in conjunction with CDM • …. Are receiving Free Basic Water

  5. Challenges in provision of Water Services • Section 78 transfer still in process • Financial constraints results in dysfunctional projects • Cost recovery measures in rural areas • Contract Management • Street taps consumption management and vandalism • Illegal connections

  6. 2.2 Sanitation • In 2001, only 13 757 households had toilet facilities at RDP level and above (8800 township water borne) • Since 2001 additional 1 048 households were provided with VIP toilets (Mampa & Rakgoatha) • 1 048 households receive free basic sanitation • R9.1 million is allocated to provide sanitation to at least extra 2151 households current financial

  7. Challenges in Sanitation • Sustainability of VIP toilets in the long term • Contamination of underground water by VIP toilets, enviro-loo might be the solution • Non-adherence to VIP standards/specifications by unqualifying households • Provision of sanitation service to institutions in rural areas • Demand for water borne sanitation vs water scarcity and cost

  8. 2.3 Electricity • As in 2001, 61.4% of households used electricity as main source of energy. • Additional 9% of the households uses electricity as main source of energy now. • Total of 1128 households receive free basic electricity • R9.1m allocated to electrify five villages (R6.7m LNM, R0,9m CDM, R1,527m ESKOM)

  9. Challenges- Electricity • Uncertainty of connection allocations due budget and infrastructure capacity • Accessibility of vending stations • Volumes of applications for Free Basic Electricity vs configured numbers • Lack of Internal resources to deal with minor breakdowns • Extension of settlement units

  10. 2.4 Waste Management • Only 8 800 households (township) have access to refuse removal services • Development of transit stations and land-fill sites • Plans are underway to expand refuse removal services to two neighbouring villages to township ( i.e. Mathibela and Mamaolo)

  11. Challenges- Waste Management • Inherited two illegal dumping sites • Lengthy process of obtaining permit for land-fill sites • Rehabilitation/Closure of current dumping sites • Expansion of refuse removal services to rural areas • Need to implement integrated waste management plan

  12. 2.5 Housing • As in 2001, 45 513 housing units lived in formal dwelling type • 3 000 housing units have been allocated by department of local government and housing up to 2004/05 • Current plans include building of 2001 units by 2007 • Quality control measures a challenge in the provision of housing

  13. 3. LED 3.1 Local Economic Development Opportunities • The Municipality seats along Dilokong corridor, thus creating opportunities for trade and infrastructural development • The municipality has Agricultural Development opportunities- both in horticulture and livestock • Several government-owned irrigation schemes operating below potential- opportunities for commercialization • Extensive land and buildings for broiler farming • Zebediela Citrus Estates has huge potential for expansion in agro-processing • Platinum mining development in Lebowakgomo and diamond mining in Zebediela-opportunities for SMMEs • Tourism opportunities- Wolkberg wilderness

  14. 3. 2 Economic Profile & Employment by Sector

  15. 3.3 G(L)DP Contribution From LNM to CDM

  16. 3.4 Strategic Programs • In line with Provincial Growth and Development Strategy, the Municipality will focus on following strategic programs : • SMME support and promotion • Poverty alleviation • Investment attraction and retention • Tourism promotion • Land use management

  17. 3.4 Expanded Public Works Program • 6 x Community Development Workers • EPWP is mainstreamed through service provision programs (labour intensive methods in capital budget implementation) • 400 jobs created since 2000

  18. 3.5 Land Use Management • Management of tribal land • Fast track roll-out of communal land rights Act • Overall land use management plans • Delays in finalisation of land claims • Post settlement issues, e.g. LRAD

  19. 3.6 Challenges- LED • Speed up development of LED strategy • Creation of sustainable jobs • Finalization of land use management plan

  20. 4. Financial Viability 4.1 Revenue Collection and Capitalbudget • Average of own revenue over the past three years was 3 083m per annum • Potential average revenue for the next three years is 20 145m per annum • Capital budget over the past four years was 113 151m

  21. 4.2 Policy Isuues • Policies approved: Supply Chain management, Petty cash, S&T. • Other financial by-laws being promulgated • Valuation roll not available, council approved process for development of Property rates policy to enable Valuation roll compilation by June 2006

  22. 4.3 MFMA Roll-out • Municipal manager and section 57 managers appointed except for community services manager • CFO appointed • Review of delegations (sections 59, 79, 82) not yet finalized • Financial By-laws in process of promulgation • Internal auditor appointed • In year and annual reporting done • Supply chain management policy approved

  23. 4.4 Financial Systems • No debt recovery system • Computerized billing system being installed to reduce indebtedness • Due to capacity problems, financial statements for 2001/02 ,2002/03 and 2003/04 were submitted late. • Auditor General ‘s report: - 2001/02- Qualified - 2002/03 & 2003/2004 – Waiting for AG ‘s report

  24. 4.5 Indigent Register • Incomplete indigent register hampering provision of free basic services • Indigent register is being updated and it will be finalized by December 2005 • Municipal organogram to be adjusted to provide for indigent officer

  25. 4.6 Challenges- Financial Viability • Narrow revenue base impact on service delivery

  26. 5. Municipal Transformation • Between 2002 and July 2004, no MM. Only CFO and Coorporate manager, organizational structure also not fully developed • Organizational structure consisting of 328 posts approved, only 70 filled. 39 posts to be filled in current financial year • Performance Management System adopted • MM and section 57 managers signed performance contracts • Performance audit committee of district municipality utilized • 27 By-laws in the process of promulgation • Skills Development Plan in place • Employment Equity plan in place

  27. 5.1 Challenges- Municipal transformation • Insufficient staff complement to implement programs

  28. 6. Corporate Governance • 25 ward committees established, only seven fully functional • R500 000 allocated in current financial year to provide support and revive ward committees • Public participation and communication strategy to be developed by June 2006 • Internal auditor appointed • Fraud prevention strategy to be developed by December 2005 • Toll-free number for corruption reporting to be established by 2007

More Related