1 / 60

Metro Wastewater Reclamation District

Metro Wastewater Reclamation District. Digester Complex What works and what doesn’t. Load - Design Configuration Feed/Recirculation Effluent Gas system Gas mixing. Digester #4 modifications Strategy, feed, foam Construction effects Digester upsets What works and what doesn,t.

vine
Télécharger la présentation

Metro Wastewater Reclamation District

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metro Wastewater Reclamation District Digester Complex What works and what doesn’t.

  2. Load - Design Configuration Feed/Recirculation Effluent Gas system Gas mixing Digester #4 modifications Strategy, feed, foam Construction effects Digester upsets What works and what doesn,t MWRD Digester Complex

  3. MWRD Digester Complex Plant Load 2002 Averages • Flow, 140 MGD • Suspended Solids, 145 Tons/day • BOD, 136 Tons/day

  4. Design Criteria Peak 2-week loads TS, 202.5 Tons/day VS, 155 Tons/day 0.13 LbsVS/cuft/day Hydraulic, 1.129 MGD 2002 load TS, 162 Tons/day(80%) VS, 131 Tons/day(85%) 0.12 #VS/cf/d (92%) .915 MGD (81%) MWRD Digester Complex

  5. MWRD Digester Complex January 2003 Digester data • VS 194 Tons/D (max) • VS 81 Tons/D (min) • 0.176 #VS/cf/d (max) • 0.064 #VS/cf/d (min) • Effects of varying digester feed rate.

  6. MWRD Digester Complex

  7. MWRD Digester Complex Sludge Holding Tank #1 • Feed tank for digesters • Capacity, 382,000 gals • 4 progressive cavity pumps @ 450 gpm ea.

  8. MWRD Digester Complex Sludge Holding Tanks 2 and 3 • De-water and future feed • capacity 1,500,000 gals each • 4 disc-flo/4 PC pumps

  9. MWRD Digester Complex Anaerobic Digesters • 10 digesters • Capacity, 1,650,000 gals each.@ 28 ft operating level (summer) • 1,472,000 gals each @ 25 ft (winter)

  10. MWRD Digester Complex

  11. MWRD Digester Complex • Digesters feed is sequenced • Feed volume by set point • Feed rate; manual flow set point or auto flow by SHT level • Feeding is continuos 24 hr/d

  12. MWRD Digester Complex

  13. MWRD Digester Complex

  14. MWRD Digester Complex

  15. MWRD Digester Complex

  16. MWRD Digester Complex

  17. MWRD Digester Complex

  18. MWRD Digester Complex • Digester effluent is withdrawn through a snorkel • Snorkels can rotate 90 degrees • Snorkels can be adjusted to control liquid level of digester • Snorkels plug often

  19. MWRD Digester Complex

  20. MWRD Digester Complex

  21. MWRD Digester Complex

  22. MWRD Digester Complex • Atari gas mixing system • Gas bubble mixing • Uses bubble cannons • Gas compressor • Uses digester gas for bubble generation

  23. MWRD Digester Complex

  24. MWRD Digester Complex

  25. MWRD Digester Complex

  26. MWRD Digester Complex Gas mixing effects • Digester contents expands • Contents specific gravity less than water • Entrained gas in contents causes pumping problems • Can generate foam

  27. MWRD Digester Complex Operational Precautions • Digester contents can expand 2 - 3 feet in depth • Standard centrifugal pumps are not effective moving this liquid • Gas compressor piping critical

  28. MWRD Digester Complex

  29. MWRD Digester Complex

  30. MWRD Digester Complex

  31. MWRD Digester Complex Digester #4 Modifications • Roof • Gas compressor • Foam trough • Foam suppression • Foam detection and alarm • Pressure relief manhole

  32. MWRD Digester Complex

  33. MWRD Digester Complex

  34. MWRD Digester Complex

  35. MWRD Digester Complex

  36. MWRD Digester Complex

  37. MWRD Digester Complex

  38. MWRD Digester Complex

  39. MWRD Digester Complex

  40. MWRD Digester Complex

  41. MWRD Digester Complex

  42. MWRD Digester Complex Foam Strategy • Lower digester levels to 25 feet - 6 feet headspace • Control digester feed to meet 15 day SRT • Pump foam out of digester to sludge holding tank • Deal with foam in sludge holding tank

  43. MWRD Digester Complex

  44. MWRD Digester Complex

  45. MWRD Digester Complex Digester Feed Strategy • Maintain constant flow rate • Do not use SHT level as a pump control • Control WAS solids / primary solids ratio • Maintain continuos de-watering operations • Maintain continuos even digester effluent flow

  46. MWRD Digester Complex Foam Pumping Strategy • Find a pump that will pump foam - a double diaphragm air actuated works well • Pump foam to SHT and de-water • Pump foam to digester #4 - use suppression equipment • Pump foam back into itself

  47. MWRD Digester Complex

  48. MWRD Digester Complex

  49. MWRD Digester Complex

  50. MWRD Digester Complex Aggressive Construction Schedule • Construction caused process interruptions • Holding solids back in process areas • Backing up digestion process • Increases load to digesters • Causes overload foaming (upset foam) • Backed up secondary Nocardia foam

More Related