1 / 11

Pohang Accelerator Laboratory POSTECH

Pohang Accelerator Laboratory POSTECH. The status of PLS EPICS application. EPICS collaboration meeting 2004 Dec 8 - 10 , 2004 RICOTTI, Tokai, JAPAN. Pohang Accelerator Laboratory Kiman Ha, M.Y Oh, J.H Kim, J.M Kim, J.W. Lee, J.C. Yun, J.H Choi hkm@postech.ac.kr.

vuong
Télécharger la présentation

Pohang Accelerator Laboratory POSTECH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pohang Accelerator Laboratory POSTECH The status of PLS EPICS application EPICS collaboration meeting 2004Dec8 - 10 , 2004 RICOTTI, Tokai, JAPAN Pohang Accelerator Laboratory Kiman Ha, M.Y Oh, J.H Kim, J.M Kim, J.W. Lee, J.C. Yun, J.H Choi hkm@postech.ac.kr EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  2. Pohang Accelerator Laboratory POSTECH Outline -Present status of PLS -New project PAL-XFEL -Summary EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  3. Pohang Accelerator Laboratory POSTECH Feedback status This has been a big issue at PLS, with epics based control system. BPM, PS, ID’s are necessary elements of the feedback operation • November, Orbit feedback operation started for user service. -Orbit stability with feedback • short term (1 hour) : < 1 m • long term (12 hours) : < 3 m • 22 sets of V and H corrector PS are involved for orbit feedback EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  4. Pohang Accelerator Laboratory POSTECH EPICS status • -Most control system upgraded to EPICS • Power Supply • BPM • RF • Modulator • ID control EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  5. Pohang Accelerator Laboratory POSTECH Hardware platforms • -VME • MVME5110 – 15 , BPM, Corrector, RF Operation • MVME5500 for RTEMS test -PC Windows • Quad MPS, Beam current, ID -PC Linux • Kicker, Septum - Power MAC G4 • Epics PV monitoring Web Server EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  6. Pohang Accelerator Laboratory POSTECH Used epics software toolkit -Matlab CA: Global orbit feedback -Ca : Operator panel, correction utility -MEDM : Operator panel -EDM : Operator panel -Gateway -Web based PV monitoring >mySQL >PHP >GNU plot -Oracle based Web server EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  7. More upgrade plan and testing Pohang Accelerator Laboratory POSTECH • -LINUX IOC kernel upgrade 2.6 • RTEMS MVME5500 IOC tested • >Environment ready >BSP(from kate Feng) and example IOC tested at MVME5500 >AsynDriver 4.0 tested E2050B with HP3458 GPIB EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  8. Pohang Accelerator Laboratory POSTECH FEL injector Linac Storage Ring fs-FIR FEL-1 FEL-2 FEL-3 PAL-XFEL layout • PAL XFEL Project • Period: 2005-2009 • Budget: 80 M$ • SASE FEL • Energy: 0.7 - 3 GeV • FEL-1: 10~50 nm • FEL-2: 2 ~ 5 nm • FEL-3: 0.1 ~ 0.3 nm EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  9. Pohang Accelerator Laboratory POSTECH Status for PAL-XFEL -October, established task force team for XFEL design -Review of construction budget -Review of Beam line -Review of Linac Microwave -Review of Diagnostics -Review of Safety EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  10. Pohang Accelerator Laboratory POSTECH XFEL control system status We are collecting FEL control system applications from LCLS, DESY,.. -Timing -Modulator -Power Supply -BPM -Diagnostic EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

  11. Pohang Accelerator Laboratory POSTECH Summary • - PLS, successfully upgraded to epics based control system • Easily accessible by high level users • Very stable control and feedback -PAL-XFEL project will require highly enhanced hardware and software EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

More Related