120 likes | 260 Vues
Join us for an insightful workshop held on September 2-3, 2004, led by Kristina von Oelreich from the Swedish Environmental Protection Agency. This session focuses on the national quality management system, emphasizing the importance of institutional, legal, and procedural arrangements for environmental reporting. Learn about the structured PDCA (Plan-Do-Check-Act) process, compliance with ISO standards (ISO 9001-4 and ISO 14001), and key strategies for maintaining and improving quality, transparency, and accuracy in environmental reporting. Together, we'll explore effective quality policies and the role of continuous improvements in enhancing environmental management systems.
E N D
Workshop on QA/QC 2-3 september 2004 Kristina von Oelreich Swedish Environmental Protection Agency
National system • Institutional • Legal • Procedural arrangements
WHY- Quality management system? • Structured process (PDCA) • Legal and other requirements • Right priorities-environmental significant aspects • Maintain and improve the national system • Quality and completeness of the inventory and reporting process
International standards • Quality system ISO 9001-4 • Environmental management system ISO 14001
PDCA -Continual improvements Quality policy Act Plan Check Do
Quality management system Different levels • National system • Sector (energy, waste)
Quality policy • Transparency • Completeness • Consistency • Comparability • Accuracy
PDCA-National system Plan • Legel and other requirements • Key sources analysis- environmental significant aspects • Uncertainty analysis • Improvements-Objectives and Plans
PDCA-National system DO • Structure and responsibility • Training, awareness • Communication • Quality system documentation • Operational control/ Document control- Inventory and reporting routines
PDCA- National system Check • Quality control (QC) • Nonconformance corrective and preventive action • Records • Quality assurance (QA) Expert Review and Audits
PDC-National system Act • EPA- management review- • Continual Improvements of the national system and the inventory and reporting process
PDCA -Continual improvements Quality policy Act Plan Check Do