1 / 12

SAP R/3 Budget

SAP R/3 Budget. SAP R/3 Costs. Hardware Software Add-on software and hardware Implementation process Training of operators Maintaining the system Opportunity costs of system failure System upgrade. Cost of Hardware.

Télécharger la présentation

SAP R/3 Budget

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAP R/3 Budget

  2. SAP R/3 Costs • Hardware • Software • Add-on software and hardware • Implementation process • Training of operators • Maintaining the system • Opportunity costs of system failure • System upgrade

  3. Cost of Hardware • Basic workstation Dell Dimension 2400 Series: $618 per unit (Bulk sales negotiated) • Quality and Development Server Dell PowerEdge 1600SC: $6,862 per unit • Production Server PowerEdge1600SC: $10,799 per unit

  4. Cost of SAP R/3 Software • SAP cost fluctuates; approx. $1.5 million. • Cost includes client-side and server-side software, backup software, operating system, test and development tools. • Modules can be customized; selected modules are pertinent to business functions

  5. NECESSARY Financial Accounting Human Resources-Personnel Admin. Materials Management Sales and Distribution FOR IN-HOUSE PRODUCTION Production Planning Quality Management General Logistics Plant Management SAP Modules

  6. SOFTWARE Backup executive file for Windows servers Veritas ver. 9.0: $300-500 Backup Storage Area Network OptionBrightStor ARCserve ver. 9: $1000-1600 HARDWARE Storage controller Adaptec SCSI RAID 2100s: $388-445 each Interface ConverterIBM SAN Data Gateway Router 2108 Model R03: $6000 Networking Cable Belkin Pro Series: $40 per 100 ft. Router D-Link DI-604: $60 Barcode ScannerWasp WLP 4170: $250-300. Cost of Add-On Software and Hardware

  7. Cost of Implementation

  8. Cost of Training of Operators

  9. Cost of Maintaining the System ANNUAL COST • Cost determined by but not restricted to the follow factors: • Customer Support • Replacement materials • Debugging and anti-virus software • Maintenance costs included on budget also comprise of wages for support personnel (cost obtained by number of employees times average yearly salary) 20 employees @ $75,000 annually= $1,500,000

  10. Lost Opportunity Costs • Gauging cost is difficult and sometimes inaccurate. • Solution: set money aside (amount still to be negotiated with size of R/3 system) for possible system failure • Scenarios to consider: • General Ledger application crashes • Infrastructure collapses • Productivity services become unavailble

  11. Periodical System Upgrade • The typical upgrade for SAP would be approx. $3.1 million. • This number can decrease, however, with the number of modules on the company’s system. • The ImageFX Upgrade cost, based upon the number of end users and modules, should approximate to about $600,000.

  12. Final Budget

More Related