1 / 4

CMS plans and requests

CMS plans and requests. Filippo Ambroglini – Università and INFN Trieste Fabio Cossutti – INFN Trieste Sunanda Banerjee - FNAL Geant4 Technical Forum 10 March 2009. CMS plans. Next major release: 3_1 Development ends on March 28 th

weaverl
Télécharger la présentation

CMS plans and requests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS plans and requests Filippo Ambroglini – Università and INFN Trieste Fabio Cossutti – INFN Trieste Sunanda Banerjee - FNAL Geant4 Technical Forum 10 March 2009

  2. CMS plans • Next major release: 3_1 • Development ends on March 28th • Should be “the release” for a mass MC production meant to be compared with the real collision data later this year • Based on Geant4 9.2 • + patches? • What will be available by the end of the month? • CMS has provided a patch to avoid string creation in G4IonTable, could you please confirm it will be available? • It depends on the result of our validations F. Ambroglini, F. Cossutti S. Banerjee

  3. CMS needs • It is likely that the round of mass production after the 3_1 one should exploit data-driven improvements • Unless major trivial bugs are discovered • From analysis of collisions data, beyond TB • Unlikely to take place before spring/summer 2010 at earliest • Therefore we need to rely on G4.9.2pXX until then (we need a homogeneous data set) • Bug fixing not seriously impacting physics results • Performance improvements • Of course we are willing to further improve G4 for the longer term future F. Ambroglini, F. Cossutti S. Banerjee

  4. CMS requirements (not already in G4 plan) • Per G4Region physics lists: is it a possible development for the future? • Use case: a mixture of homogeneous (e.g. ECAL) and sampling (e.g. HCAL) calorimeters • The optimal choice for e.m. physics vs performance balance is different (QGSP_BERT_EM vs QGSP_BERT) • At present only one choice can be done for everything • Which developments are foreseen for tracking in magnetic field? • Use case: homogeneity of B-field and accuracy needed for tracking differ widely in different regions • local field managers and step integrators defined per regions? F. Ambroglini, F. Cossutti S. Banerjee

More Related