An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Control& Queuing Group 1 Ray Quintero, Lei Tian, Jiayin Liu, Morvarid Amirfathi, Rabeeh Sahranavard, Max Tubbs

  2. Production Planning Control & Queuing - Introduction A monitoring system • Material, parts, assemblies from start to finished product • Organized and Efficient • Used in Manufacturing and Customer Service Industries Two Stages - Planning and Implementation & Control • Prod. Planning, Master Prod. Schedule, Material Req. Plan • Info gathered to create shop orders, release to shop floor • Track WIP, performance vs. plan, decide if corrective action reqd. • Report efficiency, operation times, order quantities, scrap rate Data Requirements Inputs needed for part production • Planning Files > Item Master, Product Structure, Routing, Work Center Master • Control Files > Shop Order Master, Shop Order Detail Ray Quintero

  3. Order Preparation/Scheduling Manufacturing Lead Time Operation Overlapping Operation Splitting Lei Tian

  4. Load Leveling andScheduling Bottlenecks Load Leveling: Calculating the standard hours of an operation for each order in each time period and adding them together by time period, then the load profile for a work center will be constructed. Scheduling Bottlenecks: • The definition of bottlenecks Throughput : When work centers produce more products than the bottlenecks can process, then they should build excess work-in-process. • Some bottlenecks principles • Six typical circumstances of the bottlenecks • Managing bottlenecks a. Setting up a time buffer b. Control the rate c. Increase the capacity d. Change the schedule Jia-Yin Liu

  5. Step Three: Subordinate and Synchronize • DBR • Subordinate maintenance • Sprint capacity • Minimize stops • Step Four: Elevate Performance • Performance data • Sources of lost productivity time • Updates and/or upgrades • Additional equipment • Step Five: Repeat the Process • New constraint (back to Step One) • Fresh look (back to Step One) Implementing “THEORY OF CONSTRAINT” Step One: Identify Large accumulations of work-in-process Involved process expeditors Longest average cycle time Equipment which is not keeping up with demand Step Two: Exploit A suitable sized inventory buffer Quality Continuously scheduled constraint Routine maintenance activity Other machines Other companies Morvarid Amirfathi

  6. Control:input/output controlpriority of orders 1. FCFS 2. EDD 3. ODD 4. SPTmaximize order fill rate(OFR) Rabeeh sahranavard

  7. Queuing & Conclusion Queuing- coordinating time when people or objects arrive for service -Danish Engineer A.K. Erlang, telephone demand; auto-dialers -Optimum servers to reduce cost -Service industries; hospitals, airports, etc. -Efficiency in arrivals and waiting and serving to keep customers -Competitiveness, Satisfaction, Growth -Mathematical expressions; mean queue length and delay as function of mean arrival and service rates for probability distributions Conclusion- Engineering Management tools, relatively recent, created to -Reduce cost of design and manufacturing, reduce time, increase efficiency, reduce waste, stay competitive and innovative, stay on schedule -Production Control and Queuing are geared more towards the logistics and man hours and control of different process-lines from start to finish. -Importance of planning, scheduling and organizing -All master production schedules mapped out, hours logged, queues analyzed, etc. -Without it many changes and differences and obstacles arrive, causing down-time, wasted time and money, delays, loss of customers and contracts. -Cannot succeed without organization, planning and control. -Natural human attributes, especially engineers, simply a transposition of tools we use in our lives adapted to improve the engineering world. Maxwell Tubbs

More Related