1 / 29

Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements

Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements. A Summary of Technical and Policy Materials Peter Westlin, EPA, OAQPS. Presentation Overview. Describe EPA technical guidance documents format and content

Télécharger la présentation

Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Guidance on Establishing Monitoring to Comply with CAM and Other Title V Requirements A Summary of Technical and Policy Materials Peter Westlin, EPA, OAQPS

  2. Presentation Overview • Describe EPA technical guidance documents format and content • Discuss procedures for designing monitoring and establishing indicator ranges • Discuss monitoring design evaluation factors • Describe other tools - MKB • Discuss calculations for applicability

  3. Guidance Document – CAM TGDPurpose and Scope • Provide general and detailed guidance on the implementation of the Compliance Assurance Monitoring Rule and Other Monitoring Requirements • Describe regulatory requirements and implementation procedures • For industry users and permit reviewers (applicability, requirements, tools, examples) • "Living" documents (will continue to add examples, other information)

  4. General Structure and Format • Explanatory chapters • Rule Overview - requirements, procedures • Monitoring elements • Description of monitoring approaches • Technical reference of monitoring tools • Bibliography • Appendices • Example monitoring plans (based on actual case studies)

  5. Step-by-step Process Description • Selecting a monitoring approach (guidance includes a work sheet) • Review current procedures • Compare with CAM or PMon requirements • Identify potential indicators (control device parameters) • Select reasonable approach • Develop permit application submittal

  6. Design Evaluation Factors Monitoring frequency (rule may define continuous monitoring)- general monitoring frequency concerns: • Sufficient to allow calculation over appropriate averaging periods • CAM rule minimum requirements: • Data collection at least 4/hour for large units • Data collection 1/day for other units

  7. Design Evaluation Factors Averaging periods: • Sufficient to detect control device or other potential compliance problems • Not so short as to flag minor perturbations as excursions

  8. Design Evaluation Factors Level of confidence issues: • Subjective - provides reasonable assurance of proper operation and compliance • Examples of confidence levels for different parameters for range of control measures provided in guidance • Permit application must include justification for selections

  9. Design Evaluation Factors Equipment needs - factors to consider • Location and installation logistics • Maintenance and training needs • Cost factors – inherent in source owner’s planning and design

  10. Design Evaluation Factors Selecting and justifying indicator ranges - define a basis: • Parameter data collected during testing • Historical data • Design or engineering data • From similar operations

  11. Design Evaluation Factors Selecting and justifying indicator ranges: • Type of data (e.g., instrumental or manual) • Frequency • Quantity of data for analysis • Data variability

  12. Design Evaluation Factors Selecting and justifying indicator ranges (continued) - performance criteria: • Data measured during compliance test must fall within range • Range must be indicative of good operations and compliance performance • Range must be sensitive to control device changes • Range should account for normal operational variability

  13. Design Evaluation Factors Indicator range formats: • Mean value + set value (e.g., + 50 F) • Mean value + percent of mean • Max/min value(s) observed • Max/min + set value • Max/min values + percent of mean • Combination of more than one of above (e.g., if "x" and "y", then excursion)

  14. EPA’s Monitoring Knowledge Base(WWW.EPA.GOV/TTN/CHIEF/MKB) • Basic Information • Frequent Questions • Monitoring For Permits • Compliance Assurance Monitoring (CAM) • Monitoring Information    By Control Technique • Monitoring Information    By Industry Type • Publications

  15. MKB – Information elements • Basic Information • Introduction • Ambient Air Quality Monitoring • Stationary Source Emissions Monitoring • Continuous Monitoring Systems • Text Description for each

  16. MKB - Frequently asked questions • What is monitoring? • Why is monitoring so important? • What pollutants are typically monitored? • How is ambient air monitoring accomplished? • How is stationary source emissions monitoring accomplished? • What is a stationary source emissions monitoring device? • Does the EPA require stationary source and emissions point monitoring? • What is Title V? • What is Title V monitoring? • What is the Compliance Assurance Monitoring (CAM) rule? • What is Compliance Assurance Monitoring (CAM) monitoring?

  17. MKB – Monitoring for permits • Introduction • Title V Operating Permits • New Source Review Permits Innovative/Flexible Permits • State Permit Programs

  18. MKB – Compliance Assurance Monitoring • Introduction • CAM Rule CAM • Technical Guidance Document (Includes links to all support files)

  19. MKB – Monitoring information by control technique • Activated carbon adsorber • Capture systems • Catalytic oxidizers • Compliant (low/no VOC/HAP) inks and coatings • Condenser • Cyclone • Electrified filter bed • Electrostatic precipitator • Fabric filters • Thermal oxidizers • Wet scrubbers for gaseous control • Wet scrubbers for particulate control

  20. MKB – Information by monitoring type • Example – Fabric filters • General Description • Monitoring Information • Costs • Links to resources • Training tool • Training video • Fact sheets on different FF types • Cost manual

  21. MKB – Monitoring information by industry type • Most of the information is for Printing and Publishing industry, so far • Others planned as resources permit

  22. MKB - Publications • Links to • Clean Air Act Amendments • Compliance Assurance Monitoring (CAM) Document

  23. Estimating pre-control emissions for applicability to CAM rule Annual emissions = restrictions X emissions rate Post-control Emissions Pre-controlled Emissions Control Device PSEU

  24. Determining Emissions Rates • Emissions testing • EPA test methods • Control device inlet and outlet • Mass balance measurements • e.g., VOC from solvents • Chemical reactions • Emissions factors (e.g., AP-42, site-specific test data) x activities data (e.g., hours, fuel use) • Other?

  25. Mass balance example: coal-fired boilers • Coal-fired boiler • 9% ash • 12,000 Btu/lb • Calculate precontrol emissions: 0.09 lb ash/lb coal = 7.5 lb/mmBtu 0.012 mmBtu/lb coal • Pulv. Coal: 90% suspended ash 6.8 lb/mmBtu • Stoker: 20% suspended ash 1.5 lb/mmBtu

  26. Eo Ei unit dust collector Mass balance example: wood working facility pseu unit Eo = 8 T/Y (measured via source test) Control Eff = 90% Ei = 8 {1/(1 - 90/100)} = 80 T/Y

  27. Uncertainty • Emissions testing data • Accurate but short term • Do not represent process upsets • Emissions factors (e.g., AP-42) • Variable from SCC to SCC • Can easily be factor of 2 to 4 high or low • Emissions control efficiencies • Higher efficiencies (e.g., >90%) - imprecision can lead to huge errors in calculating precontrol emissions

  28. CAM Rule applicability examples Pre-control Post-control Subject to Data emissions emissions part 64? frequency? 600 TPY 20 TPY Yes One/day 2000 TPY 105 TPY Yes Four/hour No 90 TPY 5 TPY NA 5000 TPY 5000 TPY No NA

  29. Questions?

More Related