An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APPEARANCE OF THE TANK BEFORE THE COATING INSTALLATION OF THE SCAFFOLDINGS

  2. INSTALLATION OF COMPRESSOR & PIPPING THE BLASTING POT PREPARATION,TEST BLASTING FOR PROFILE & CHECK FOR PRESSENCE OF OIL

  3. MATERIALS TO BE USED FOR THE INTERNAL COATING CHECKING THE SURFACE TO A WHITE METAL FINISH

  4. CONDUCT CHLORIDE TEST FOR SALT CONTAMINATION TEST RESULT 1PPM (3 PPM IS THE MAXIMUM VALUE)

  5. APPLICATION OF ENECON PUTTY TO THE JOINT & DEEPLY PITTED AREA CONDUCT WET FILM THICKNESS DURING APPLICATION 1ST COURSE COATED WITH ENECON CHEMCLAD SC

  6. 2ND COURSE COATED WITH ENECON CHEMCLAD SC APPLICATION FROM 3RD COURSE TO THE TOP AREA, 1ST PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 2ND PART

  7. APPLICATION FROM 3RD COURSE TO THE TOP AREA, 3RD PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 4TH PART APPLICATION FROM 3RD COURSE TO THE TOP AREA, 5TH PART

  8. FINISHING OF THE TOP PART OF THE & THE ENTIRE 6 COURSE BLASTING & PAINTING OF THE BOTTOM PART OF THE TANK

  9. AREA BEING REPAIRED A 12X16 HOLE WAS MADE & DAMAGED THE COATING FINAL APPEARANCE OF THE AREA AFTER THE REPAIR WITH ENECON PUTTY & OVERCOAT WITH CHEMCLAD SC

  10. TANK 2 BEFORE ENECON CHEMCLAD SC APPLICATION TANK 2 AFTER ENECON CHEMCLAD SC APPLICATION