1 / 18

SYSTEM SELLING BINDER

SYSTEM SELLING BINDER. WHY NOT HEAT PUMPS. COST TOO MUCH TO BUY COST TOO MUCH TO OPERATE COST TOO MUCH TO MAINTAIN TOO COMPLICATED TOO NOISY. SOFTWARE. LEEDS OPERATING COST CLIMASIZE SOUND ANALYZER. WSHP INSTALLED COST. FOUR PIPE INSTALLED COST. SUMMARY. RELATIVE INSTALLED COST.

wilson
Télécharger la présentation

SYSTEM SELLING BINDER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SYSTEM SELLING BINDER

  2. WHY NOT HEAT PUMPS • COST TOO MUCH TO BUY • COST TOO MUCH TO OPERATE • COST TOO MUCH TO MAINTAIN • TOO COMPLICATED • TOO NOISY

  3. SOFTWARE • LEEDS • OPERATING COST • CLIMASIZE • SOUND ANALYZER

  4. WSHP INSTALLED COST

  5. FOUR PIPE INSTALLED COST

  6. SUMMARY

  7. RELATIVE INSTALLED COST

  8. ASHRAE MEDIAN LIFE WLHP 19 ROOFTOP 15 PTAC 15 MARRIOTT PTAC 7 CHILLERS 20

  9. OPERATING COST CONSUMPTION-KW/SQ FT/YR 2 PIPE FC 1.3 VAV ROOFTOP 1.2 VAV CENTRAL 1.1 PTAC 1.3 PTHP 1.2 WLHP 1.0

  10. AIR COOLEDE CONDENSERS 27 % COIL EFFICIENCY LOSS 10.0 EER ERODED TO 7.3 IN 18 MONTHS CONDENSER FAN MOTOR FAILURE 15% PER YEAR SHORTENED COMPRESSOR LIFE

  11. MAINTENANCE COST 2 PIPE FC 1.4 VAV ROOFTOP 1.1 VAV CENTRAL 1.2 PTAC 0.8 PTHP 0.85 WLHP 1.0

  12. QUICK RULES OF THUMB • AVERAGE SQ FT/TON 300 • AVERAGE CFM/SQ FT 1 • AVERAGE LIGHTING LOAD 2-3 W/FT • AVERAGE INSTALLED COST $5-8/FT • TENNANT FIT COST $2/FT • MAINTENANCE COST WSHP $.10/FT/YR GEO .07 VAV .135 AIR/AIR .14 • HAVAC USES 45-55% OF ENERGY • OF THIS AMOUNT COOLINGTOWER 6% BOILER 23 SYSTEM PUMP 24 HEAT PUMPS 48

  13. QUICK SELECTION METHODS • BUILDING SIZE 100,000 SQ FT • USE 300 PER TON 100,000/300=333 TONS • USE 2.5 GPM PER TON 333 x 2.5=832 GPM • PUMP SELECTION USE 75 FT OF HEAD • BHP=956 X 8.3 X 75/33000 X .75 EFF=24 HP • TOWER SELECTION USE WB PER ASHRAE LOCATION • USE 90-101 DEGREES • USE 956 GPM • BOILER SELECTION USE 50% DIVERSITY • BTU=956 X 500 X3.5 DEG=1673,000 • VENTILATION PER LOCAL CODE USE 1 CFM PER SQ FT • IF RATE =15%=15000 CFM

  14. SOUND • UNITS CHANGES • COMPRESSOR ISOLATION • FAN ISOLATION • CHASSIS ISOLATION • MUFFLERS • ROTARY AND SCROLL COMPRESSORS • 410 A

  15. SOUND • NEW CERTIFIED SOUND LAB • CERTIFIED SOUND POWER DATA

  16. FACTORY VISITS

  17. NATIONAL REFERENCE JOB LIST

  18. BULETINS • TECHNICAL • COMPETITIVE • MARKETING • OTHERS

More Related