1 / 23

ETA Environmental Health and Safety Monthly Metrics May, 2017

ETA Environmental Health and Safety Monthly Metrics May, 2017. ETA Accidents- 5/17. ETA Accidents- By Type. ETA Accidents- Severity. ETA Emergency Incidents- 5/17. ETA Ergonomic Assessments- By Month. Open ETA Ergonomic Assessments. ETA Incomplete Training Assignments.

wnewcomb
Télécharger la présentation

ETA Environmental Health and Safety Monthly Metrics May, 2017

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ETA Environmental Health and Safety Monthly Metrics May, 2017

  2. ETA Accidents- 5/17

  3. ETA Accidents- By Type

  4. ETA Accidents- Severity

  5. ETA Emergency Incidents- 5/17

  6. ETA Ergonomic Assessments- By Month

  7. Open ETA Ergonomic Assessments

  8. ETA Incomplete Training Assignments *Does not include SEC0203 “External Notification”

  9. % Training Completion Status

  10. Incomplete Training by Course Type(Total Incomplete Assignments = 83)

  11. Training Assignments Due (Total = 83) Open Assignments by Division Open Assignments by Hire Date

  12. ETA Training Assignments Due

  13. Pending ETA Work Activities

  14. ETA Work Activity Summary (Active)

  15. ETA Activity Manager AssignmentsETA Total Personnel- 814

  16. Electrical Equipment Inspection Failure Status (Red Tag) Equipment listed in the EEIP database as “failed” and requires repair prior to use.

  17. ETA Failed “Red Tag” Electrical Equipment Status (6/1/17)

  18. Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) Equipment listed in the EEIP database as “Conditionally Accepted” and requires repair within 120 days.

  19. ETA “Conditionally Accepted” Electrical Equipment Summary (6/1/17)

  20. Corrective Action Reports (CATS)- 5/17

  21. Audits and Inspection Status- 5/17

  22. Significant Safety Achievements- 5/17 • A total of 18 Work Activities were successfully renewed during May. Many involved EHS collaboration and lab visits. Another 6 are pending release by EHS. • New Work Activities Developed in May include: • CY-0018- Electron Beam Heater (Schwede) • ED-0028 and ED-0029- Use of Bruker XRF (Weber) • ED-0030- Hydrofluoric Acid Use (Tong) • ED-0031- Accelerated Aging of Solar Cell (Liu) • Telecommuter ergonomic evaluations have started. Instructions were sent out to affected workers. We are collecting home office photos. • ESDR conducted their first Safety Committee meeting. A number of action items were identified for the committee to work on. • I participated on a Effectiveness Review Team for the LBNL Electrical Safety Improvement Plan (ESIP). Several dozen interviews were conducted. • Approximately 20 non-returnable gas cylinders were sent out for disposal. • A “defective equipment” safety alert was distributed to affected personnel. • An inventory of Parr pressure reactors in ESDR was compiled. Equipment was inspected and storage locations identified.

  23. Short Term Safety Outlook 6/17 • Eight more Level 2 and Level 3 Work Activities are due for biannual/annual renewal in June. • Complete the telecommuter ergonomic assessments. There are 50 ETA workers that need to be evaluated. • Continue participation on the Hazardous Waste Requisition improvement team. • Assist with the new glove box installation in 70-226. • Coordinate EEIP electrical equipment inspections of non-NRTL ovens in B62 and B70. • Coordinate seismic restraints of ovens in ETA lab areas. • Continue with EHS walkthroughs of ETA lab spaces. • Assist Cyclotron Road Cohort 3 researchers with start-up of their projects. This includes set-up of new lab areas in B62.

More Related