xenon
Uploaded by
36 SLIDES
564 VUES
370LIKES

SDLS (Satellite Data Link System) SYSTEM PRESENTATION

DESCRIPTION

SDLS (Satellite Data Link System) SYSTEM PRESENTATION. ICAO ACP Working Group C - Toulouse October 2003 ACP WGC6/WP1 9. PRESENTATION PLAN. PART I - INTRODUCTION & CONTEXT PART II - SDLS SYSTEM DESIGN PRESENTATION PART III - PROJECT STATUS AND WAY FORWARD. PART I - INTRODUCTION & CONTEXT.

1 / 36

Télécharger la présentation

SDLS (Satellite Data Link System) SYSTEM PRESENTATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SDLS (Satellite Data Link System) SYSTEM PRESENTATION ICAO ACP Working Group C - Toulouse October 2003 ACP WGC6/WP19

  2. PRESENTATION PLAN • PART I - INTRODUCTION & CONTEXT • PART II - SDLS SYSTEM DESIGN PRESENTATION • PART III - PROJECT STATUS AND WAY FORWARD

  3. PART I - INTRODUCTION & CONTEXT

  4. SDLS a CANDIDATE to NEXSAT INITIATIVE The European Space Agencyand Eurocontrol areco-ordinating their effort • An Agreement of Co-operation has been signed and one task is to progress the definition of a Next Generation Satellite System

  5. SDLS AND NEXSAT CONTRIBUTIONS • Eurocontrol and ESA associate their effort to develop a New Generation Aeronautical Satellite System

  6. SDLS MISSIONS • SDLS Definition • SDLS is as a potential Next Generation Aeronautical Communication System • SDLS Missions • as specified in Eurocontrol Mission Requirement Document, in line with Nexsat initiative • Complement the VHF communication system in Europe • Support datalink applications deployment in dense Airspace • World-wide coverage / Regional deployment capabilities • Supports communications needs on remote and oceanic airspace • Interoperable / Open architecture

  7. SDLS GENERAL CONCEPT • Safety dedicated system (ATS and AOC communication) • Operation in protected radio-spectrum band ( L-band AMS(R)S ) • Network security through clearly segregated system • Controlled network with Guaranteed Performances • Low cost infrastructure and operational cost • Light and easy to install terminal • Omnidirectional antenna • Mono-Transmission Channel terminal • Based on up-to-date communication technology • Compatible to proven Bent-pipe Geostationary satellites • Distributed network implementation capability (reduced ground network infrastructure) • Capability for low cost GES implementation (in Ku band) • Optimised network architecture (Spectrum efficiency)

  8. SDLS SERVICES • Services supported : • ATM services (Services link2000+) • AOC services (including support of ACARS) • Critical Short data services • Voice services (Point to Point, Party Line)

  9. QUALITY OF SERVICE DATA SERVICES VOICE SERVICES

  10. SDLS HIGH LEVEL SPECIFICATIONS • Basic raw data rate 5.6kbps over dense areas (regional spot beams) • Reduced raw data rate 3.2kbps over oceanic and remote airspace (global beams) • BER : 10-5 for data, 10-3 for voice - Link availability 99.99 % • QoS management

  11. PART II - SDLS DESIGN PRESENTATION

  12. SDLS DESIGN PARADIGMS • Direct Sequence Code Division Multiple Access System (DS-CDMA) • + • Geostationary bent-pipe satellites • Advantages of this configuration : • Cancellation of Near-Far limitation of terrestrial CDMA systems • Cancellation of frequency guard bands due to AES Doppler • Cancellation of time guard with TDMA/CDMA configuration • Resistance to interference, multipath and fading (scintillation..) • Other by-products of interest : • Supports decentralised access scheme • Security at radio transmission level

  13. WAVEFORM (Results of optimisation studies) • CDMA Access mode • Similar waveform on forward and return links • Synchronous/Quasi Synchronous CDMA scheme • alignment spec.1/8 of a chip • Reference carriers for synchronisation and power control • Asynchronous transmissions limited to GES and AES network entries • Modulation QPSK with pulse shaping • Spreading : Gold codes with a spread factor of 127 (BW=1MHz) • Single Data/Voice Channel Coding : • Turbo code with rate 1/2 • Eb/No=2.6dB (256 bits blocks)

  14. BASIC AES CHARACTERISTICS • Design target : low cost SATCOM terminal • (i.e. similar to a VHF radio). • Basic Terminal • Mono-transmit channel terminal with 30W HPA operated at saturation • Omnidirectional antenna (0dBi at 5°, G/T -25dB/K) • Include all the protocol stacks • Supports Arinc 429 or Arinc 664 Interfaces • Terminal Option • AERO-I/H existing terminals supported (better EIRP-G/T figures) • Up to 22kbps (4 times basic rate) could be provided

  15. Current LINK BUDGET - MOBILE LINK

  16. Possible Data Rate Improvement on future platforms

  17. A Generic Distribution T CHANNEL T T T T ... T T CDMA Codes n AES1 8 AES2 AES3 2 AES4 1 C C A A A Generic Distribution A CHANNEL A T T T Ar Ad Ar Ad ... Ar Ad Dedicated Return Carriers shared by several AES (Except voice multiplexed carriers) T AES1 AES2 AES3 AES4 Collision AES1 and AES3 ACCESS - CARRIER DISTRIBUTION Common ASYNC CDMA shared by all AES (Spread-ALOHA). Log-on purpose (L channel) AES Forward CDMA carriers AESx P and C AES2 AES3 GES AES1 AES4

  18. ACCESS - CARRIER DEFINITION • Typical payloads / bursts • P, T, C : 150 bytes (Long Block Data Unit) • A :Ar : 32 bytes (Short Block Data Unit) • Ad : 8 bytes (Super Short Block Data Unit)

  19. Optimised Satellite Gateway Network Architecture Paradigm

  20. Gateway vs. Transparent Example • Protocol Overhead reduction • Minimal retransmissions • Channel efficiency optimisation • Flow control Satellite Link Optimised Interface SDLS Gateway Model Network Dependent Interface Transparent Network Model

  21. QoS Management

  22. Supported Diversity Schemes • SDLS Design can be instantiated with diversity schemes at several levels : • AES : • Two patch antenna to avoid masking • 2Rx / 1 Tx terminal • 2Rx / 2 Tx terminals • GES : • GES site diversity in Ku band the feeder links to remove rain attenuation effect (up to 10dB) • Satellite : • Two satellites in hot redundancy

  23. System Expandability • SDLS is fully scalable. • Minimal Configuration • Operation in a single spot with one control and traffic station NMS/GES • Multi GES • Many GES can be instantiated in the system • Transparent introduction allowed by the CDMA structure of the system • Multi Frequency Slots • Expandability by steps of 500/1000KHz on the same transponder • Multi Spots • On the same satellite, several spots can be used simultaneously • Only one Network Master Station required for all spots • Multi Satellite • All system expansions are transparent to the Avionics

  24. PERFORMANCE FIGURES (I) • SDLS Traffic and capacity assumptions (from Eurocontrol ref.) • Capacity assessment per aircraft

  25. <27 s <7,2 s Priority 2 (QoS3) Priority 3 (QoS4 & 5) FDW RT Transit Delay (sec) P P Long* Short Ar Short P T Long* 12,29 T P P T Priority 1 (QoS1 & 2) 4,41 <4,5 s 3,30 6,71 7,65 Ar PERFORMANCE FIGURES (II) • Initial Simulation Results • Hypothesis & Modelling • Queuing Analysis based on Markov models • One GES configuration / One spot beam • PIAC of 2000 aircrafts • Preliminary Results *Long packets imply to make a reservation on A channel

  26. Forward P channels 27 30 Number of CDMA channels Return A channel TBD TBD 1 GES configuration 15 GES configuration* Return T channel 13 15 Totalnumber TBD TBD *Uniform PIAC AES distribution among 15 GES PERFORMANCES (III) • Summary Table: Total number of CDMA channels (PIAC 2000 aircrafts)

  27. COST FIGURES (I) • SDLS Service Unit Costs: Results for Data Cost Hypothesis : Space capacity lease from 1 to 2M€/year/MHz/39dBW

  28. COST FIGURES (II) • SDLS Service Unit Costs: Results for voice Cost Hypothesis : Space capacity lease from 1 to 2M€/year/MHz/39dBW

  29. PART III - PROJECT STATUS

  30. EXPERIMENTATION STATUS • Slide 1 : Initial Feasibility study • Slice 2 : SDLS Demonstrator Baseline system qualified in July 2002, with : • SDLS Network elements : NMS - GES - 2 AES • SDLS Test Bed : set ATS and AOC applications • SDLS Demonstrator Extension under completion : • System Qualified on ESA Artemis Satellite (September 2003) • Second Access Station deployed in Rome (November 2003) • Slice 3 : SDLS Operational system study On-going • SDLS Experimentation Plan for next phase include : • Performance test bench development (transmission and network simulations) • Real life test based on SDLS Demonstrator (with embarked tests)

  31. SDLS SLICE 3 - WBS Service Analysis Economic Analysis Experimentation Detailed Studies System Consolidation

  32. SDLS SLICE 3 : STUDY PHILOSOPHY Making top-down and bottom-up approaches converge User needs Analysis, Service Requirements Future SATCOM Solution SDLS feasibility analysis and technical solutions Solutions & Trade-Offs Access Protocols Waveform

  33. SDLS SLICE 3 STUDY OVERVIEW Thales ATM (F) Indra (SP) AlcatelSpace Schlumberger Sema (SP) Airtel (Ir) Alcatel Bell (B) Vitrociset (I) Skysoft (P)

  34. Slice 3 : Operational System Study Status • Core studies have been conducted • Services and QoS figures defined • Baseline system architecture defined • Studies currently on-going with short term results expected • Transmission : • Alternative spreading/scrambling schemes performance evaluation • Envelope variation minimisation through complex scrambling • Code reuse between spot using scrambling • TCM-8PSK evaluation (bandwidth reduction) • Reduced spreading option analysis in 500kHz bandwidth • Network Architecture : • Access performance refinement • Gateway stack definition and performance refinement • System consolidation activity on-going • Outputs : • System Design Concepts Justification File • System Functional Specification

  35. OPEN ISSUES & WAY FORWARD • Consolidation of Mission Requirements with Eurocontrol • Performances Verification • Simulation models to be developed to confirm preliminary results • network/protocol efficiency, capacity, QoS compliance • system availability refinement (scintillation effects…) • Safety assessment • Safety analysis to be performed • Security requirements • Functions linked to security management could be included in the design if required (authentication / crypto / ..) • Experimentation • Leverage existing system demonstrator to validate system key features (access diversity, gateway prototyping, environmental tests including in-flight demonstrations)

  36. SDLS 2004 - 2005 SDLS Demonstrator System Prototype Experimentation EXPERIMENTATION Flight Test Pre-Operation SDLS Slice 3 Pre-Operational System SDLS Phase B Completion System Specification DEVELOPPEMENT D SDLS Phase C MRD V1 • CDR MRD V2 • PDR SARPS/MOPS NexSat Initiative STANDARDISATION Users Steering Group Contribution to ICAO 2005 2003 2004

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer