380 likes | 535 Vues
C. enter for. R. eliable. C. omputing. Improving Detactability of Resistive Open Defects in FPGAs. Mehdi Baradaran Tahoori and Edward J. McCluskey Center for Reliable Computing Stanford University. Outline. Problem Statement Introduction Resistive opens in ASICs FPGA Model Detection
E N D
C enter for R eliable C omputing Improving Detactability of Resistive Open Defects in FPGAs Mehdi Baradaran Tahoori and Edward J. McCluskey Center for Reliable Computing Stanford University
Outline • Problem Statement • Introduction • Resistive opens in ASICs • FPGA Model • Detection • New Techniques • Path Delay Analysis • Simulation Results • Summary
Statement of Problem • Problem addressed • Detection of resistive open defects • In FPGA interconnect network • Resistive opens • Increase circuit delay • Do not change signal values • Need at-speed testing
Statement of Results • Improving detectability • By magnifying effect of the defect • Up to 12x increase • Detection at lower speeds • Techniques • Increase fanout load • Increase wire load capacitance
Resistive Opens • Imperfect connection between two circuit nodes • Defect resistance • Causes: • Imperfect Contact • Imperfect Via • Thin Wire
Modeling of Resistive Opens • Delay of defective transistor • Falling transition • Rtr(VDD): Transistor turn-on resistance • Function of VDD
Terminology • Delay Delta • Delay Ratio • Higher delay ratio Higher detection resolution
Outline • Problem Statement • Introduction • Resistive opens in ASICs • FPGA Model • Detection • New Techniques • Path Delay Analysis • Simulation Results • Summary
Xilinx Virtex FPGA Model Logic block CLB IO Mux Switch Matrix (SM) Line Segments
Switch Matrix N2 N3 N1 SRAM Buffer W1 E1 E2 W2 Programmable Interconnect Point (PIP) E3 W3 S3 S1 S2
PIP • Programmable Interconnect Point • Two types of PIPs in each switch matrix • Buffered PIP • Pass transistor + buffer • Connected to longer wires • Faster • Unbuffered PIP • Only pass transistor • Connected to shorter wires • Less area
Issues in FPGA Testing • Circuit is Reprogrammable • Lots of available unused routing resources • 5-10% routing resource utilization • Even with 100% logic utilization • Controllable parameters • Test voltage • Test temperature • Test frequency • Load capacitance
Modeling of FPGA • Simple routing path • PIP and logic blocks • Input and output stages of logic blocks • Inverter buffers (next slide) IN OUT Logic block Switch Matrix
SPICE Simulation of FPGA Model • TSMC 0.18 technology • Various voltages and defect resistances • Nominal supply voltage: 2.5 V Inside Switch Matrix
Dependence of Delay on VDD * Nominal
Dependence of Delay Ratio on VDD * Nominal
Conclusion • Consistent with simulation results for ASICs • Higher VDD Higher delay ratio • Increase in delay ratio • Less than 5%
New Technique for Delay Ratio • Increase load capacitance • Additional fanout paths • Unused PIPs • Increased delay ratio OUT IN A B C Logic block Switch Matrix
Circuit Model • One additional fanout • Turning on one more PIP • Maximum number of fanouts • Number of PIPs connected to A A
SPICE Simulation Results • Nominal voltage • Significant increase in delay ratio • Improvement scalable • with number of additional branches • More delay ratio for larger defects • Detection at lower tester speed !
Path Delay Analysis • Effect of Path length on delay ratio • Two cases • Unbuffered PIPs • Pass transistor • Buffered PIPs • Pass transistor + Inverter
Unbuffered PIPs • Simulation for various path lengths • One additional fanout
Delay Ratio • No fanout
Delay Ratio • One additional fanout in 1st stage
Improvement • For various path length
Buffered PIPs • Simulation for various path lengths • One fanout
Delay Ratio • No fanout
Delay Ratio • One additional fanout in 1st stage
More Increase in Delay Ratio • Using line segment loads in additional fanouts • For unbuffered PIPs • Increase in total load capacitance • Stages not isolated OUT IN B A C Logic block Switch Matrix
Circuit Model • Wire • RC network • Lumped model
SPICE Simulation Setup • TSMS 0.18 m technology • Two kinds of wires • Short Wire (100 m) • Single lines in FPGA • Rw = 10 , Cw = 43 fF • Long wire (1.4 mm) • Hex and long lines in FPGA • Rw = 140 , Cw = 615 fF
Simulation Results • Increase in delay ratio • Scalable • Proportional to number of fanouts • Non-sensitive to path length • Almost same improvement • Unbufferd PIPs • Better results • Capacitance of extra line segments
Summary • Detection of resistive opens in FPGAs • Increase load capacitance • Additional fanouts • For buffered PIPs • + Line segment loads in fanouts • For unbufferd PIPs • Scalability • Path Delay Analysis