1 / 3

MOD_11_11 Interconnector Data Submission Point

MOD_11_11 Interconnector Data Submission Point. History of Section 7 Provisions. Interim arrangements first introduced with Mod_45_07 Provisions subsequently extended with Mod_40_08 Further extension Mod_31_10. Interconnector Data Submission Point. Interconnector Data Submission Point:

yan
Télécharger la présentation

MOD_11_11 Interconnector Data Submission Point

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MOD_11_11Interconnector Data Submission Point

  2. History of Section 7 Provisions • Interim arrangements first introduced with Mod_45_07 • Provisions subsequently extended with Mod_40_08 • Further extension Mod_31_10

  3. Interconnector Data Submission Point Interconnector Data Submission Point: The notional point at which Interconnector Units, Interconnector Residual Capacity Unitsand Interconnector Error Units are deemed to be joined to the SEM and at which relevant metered values are collected, prior to Loss-Adjustment and in respect of the transmission of electricity across an Interconnector into SEM. Connection Point: The physical point where the Party’s Generator Unit or a constituent of a Supplier Unit as applicable is joined to the Transmission System or the Distribution System as appropriate. IDSP (Moyle) IDSP (EWIC)

More Related