PV Monastiraki 150kW

PV Monastiraki 150kW. Presentation September 2010. Main data of the project. Installed Capacity: 150 kW Location: Northern Greece, Evros Prefecture, Feres Municipality, near Monastiraki village Land ownership: Lease Agreement with the Prefecture of Evros

yoko
Télécharger la présentation

PV Monastiraki 150kW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PV Monastiraki 150kW Presentation September 2010

  2. Main data of the project • Installed Capacity: 150 kW • Location: Northern Greece, Evros Prefecture, Feres Municipality, near Monastiraki village • Land ownership: Lease Agreement with the Prefecture of Evros • Construction Cost (including connection costs): around 1 million Euros • In function from September 2009

  3. Further development • Application to PPC for expansion of the existing project with 300kW • In the plot of the project is also installed a wind measurement mast from CRES since 8 months. The 6 months report shows 6,3m/sec in 10m height. It is planned an installation of one 50kW wind turbine (waiting for PPC start accepting applications) and one 3MW Enercon E101wind turbine.

  4. Location

  5. Technical Data • Constructor : KLT Energy • 681 PV Panels BP Solar 3220 N • 9 Inverters SMA SMC 11000 TL ESS GR • 216m K2 Mounting System • Control System SMA Web – Box • Alarm System FBI OMNI 400

  6. Annual Production • September 2009 > 30.480 kWh • October 2009 > 17.840 kWh • November 2009 > 12.320 kWh • December 2009 > 5.840 kWh • January 2010 > 8.640 kWh • February 2010 > 12.080 kWh • March 2010 > 18.926 kWh • April 2010 > 21.983 kWh • May 2010 > 26.054 kWh • June 2010 > 21.778 kWh • July 2010 > 23.760 kWh • August 2010 > 24.227 kWh

  7. Annual Income (Feed-In Tariff 0,4 €/kWh) • September 2009 > 13.289,28 € • October 2009 > 7.778,24 € • November 2009 > 5.371,52 € • December 2009 > 2.546,24 € • January 2010 > 3.767,04 € • February 2010 > 5.266,88 € • March 2010 > 8.327,44 € • April 2010 > 9.672,52 € • May 2010 > 11.463,76 € • June 2010 > 9.582,32 € • July 2010 > 10.549,44 € • August 2010 > 10.756,79 €

  8. Photos of the project