1 / 32

Herding Cats with COTS A Journey in the CM of PDMLink

Herding Cats with COTS A Journey in the CM of PDMLink. Chris Russell June 15 th , 2011. Agenda. Overview of Sandia National Laboratories (SNL) Mission and Business Context Convey SNL’s PDMLink Deployment Goal Describe SNL’s PDMLink Challenges

yori
Télécharger la présentation

Herding Cats with COTS A Journey in the CM of PDMLink

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Herding Cats with COTS A Journey in the CM of PDMLink Chris Russell June 15th, 2011

  2. Agenda • Overview of Sandia National Laboratories (SNL) Mission and Business Context • Convey SNL’s PDMLink Deployment Goal • Describe SNL’s PDMLink Challenges • Define SNL’s approach to integrating Workforce, Industry Standards, and the PDMLink solution

  3. SNL’s Mission: Exceptional Service in the National Interest • National Security Laboratory • Broad mission in developing science and technology applications to meet our rapidly changing, complex national security challenges • Safety, security and reliability of our nation’s nuclear weapon stockpile

  4. Nuclear Weapons • Weapon Life Extension • Neutron Generators • Stockpile Support • Nuclear Materials Protection • Defense Systems and Assessments • Surveillance & Reconnaissance • Integrated Military Systems • Remote Sensing and Verification • Proliferation Assessment • Homeland Security and Defense • Threat Detection & Vulnerability Assessment • Cyber Security • Radiation Sciences • Microsystems & Engineering • Computational Science & Engineering • Energy, Resources, and Nonproliferation • BioEnergy Science • Renewable Energy Science • Nonproliferation

  5. SNL’s Business Context The Stakeholders The Enterprise The Enterprise has ~ 4000Staff using PDMLink and ~ 20,000+ potential candidates The Site SNL has ~ 3000+ candidates for PDMLink use. PDMLink is not the only tool in town. The Group ePRIME has ~ 400 employees using PDMLink today and ~600 licenses available for use Note: PDMLink Potential User Candidates is notional and only seeks to est. relative magnitude.

  6. ePRIME’s PDMLink Deployment Goal Integrate CMII and Software Engineering processes to provide the ePRIME team with the common knowledge to • Efficiently share communication • Coordinate the execution of tasks • Ensure data integrity throughout the product lifecycle • Reliably produce auditable results • Using the minimal amount to tools necessary that meet Stakeholder requirements for deploying PDMLink to our Engineering customers.

  7. ePRIME’s PDMLink Challenges • Adapting PDMLink Administrative Roles into Software Engineering and Configuration Management Standards (e.g. RUP, CMMI, ITIL, CMII, GEIA-649, etc.). Developing and implementing an Administrative Process for the PDMLink solution. . Maintaining End User Role (e.g. Product Mgr, Change Admin, Designer, etc.) and WTObject (e.g. Lifecycles, OIRs, Workflows, Attributes, etc.) configurations. 1 2 3

  8. 1 • SNL’s PDMLink Administrative Role Challenges

  9. SNL Interpretation BOCA - Solution Architecture Planning (Next Release) PTC GES – System Governance Support (Tier 6) TSAM - Solution Dev (User Support Tier 5) Manager Project Manager: Ensures requirements, scheduled planning, and execution activities (including risks and issues) are resolved, documented, and communicated; Performs PDMLink briefings to SNL Executives. System Governance Plan Design Verify Rollout Operate Optimize Mgmt. Requirements Management Project Manager Schedule Management Issue Management Requirements Consolidation and Management Architect Deployment Architecture Planning Solution Dev (User Support Tier 4) Developer Migration System Validation Sys. CM Solution Architecture Planning Security Architecture Planning Information Technology Installation and Configuration System Configuration Management Business Administrator: Establishes Service Level Agreement (SLA) with Engineering Organizations; Develops System Requirements Specification (SRS) document; Supports the design and development of customer requirements into PDMLink functional specifications (i.e. lifecycle, workflow, attributes, rules, permissions, preferences, and other constructs). Backup and Recovery Monitoring and Maintenance System Administrator Troubleshooting Performance Assurance Upgrade User Support (Tier 3) Requirements Management Security Architecture Planning Business Administrator Business Process Modeling Business Process Monitoring Upgrade Reconciliation Upgrade Socialization & Deployment Business Troubleshooting Process Administration User Support (Tier 2) Context Team Development System CM

  10. SNL Interpretation (con’t) Training Development Trainer Sys. CM User & Support Team Training Plan Design Verify Rollout Operate Optimize Archive and Purge Trainer:Develops and provides training and testing materials (i.e. presentations, desktop aids, videos, exercises, exams, etc.); Works with SNL Corporate Learning for course and Computer Based Training (CBT) offerings; Ensures training materials provide value to Users; Compiles, trends, and reports Training metrics; Maintains User Training Records. Support Desk Sys. CM User Support (Tier 1) Principle ‘User’ Administration CAD & Doc Mgmt Execution PR & CR Generation Sys. / Context CM Business Process Monitoring Support Desk: Responsible for the initial assessment /resolution of a given User issue; Directs Tickets/Issues to the appropriate knowledge center with the ePRIME team (e.g. CAD, Non-CAD, IT, or Hwd.); Compiles, trends, and reports User Issue metrics; Performs “User Activation & Deactivation” processes. Context Manager Security Administration and Monitoring User Support (Tier 0) Context Team ‘User’ Administration Doc Mgmt Execution Product Structure Execution Business Managed Baselines Context Reporting PR & CR Generation Change Admin Sys. / Context CM Sys. / Context CM Sys. / Context CM CAD & Doc Mgmt Execution CAD Lead Designer Product Structure Execution PR & CR Generation CAD & Doc Mgmt Execution CAD Designer PR & CR Generation Doc Mgmt Execution Member (SME) PR & CR Generation Basic Member (Contributor) Task / Assignment Execution PR & CR Generation Guest Read / Download Only

  11. SNL’s PDMLink Administrative Process Challenges 2

  12. PDMLink Administrative Process Observations • PDMLink does not appear to come with OOTB documentation that defines how to integrate PDMLink Admin Roles into an existing workforce. • SNL has mixed skills and standards support the development and deployment of PDMLink: • Software Engineers from RUP, &/or CMMI, • Hardware System Engineers from INCOSE, • Project Managers from RUP &/or PMBoK, • Configuration Mgrs. from CMII, ISO10007, & GIEA-649, and • Help Desk Staff that may or may not have ITIL experience. The absence of a defined PDMLink Administrative Process has impacted roll-out at SNL.

  13. SNL’s PDMLink Operations Process Line Org. Agreement Service Level Agreement Business Admin SNL has deployed an Administrative Process that articulates how the PDMLink Admin Roles conduct business and manage the PDMLink environment for our Engineering customers. This process is one step above “ad hoc” and is a blend of CMII and Software Engineering practice. This process also blends the use of PDMLink and ClearCase as the bi-directional source of truth. User Incorporation PDMLink Account Support Desk Support Desk User Issues Support Desk Configuration Mgmt. System Requirements Business Admin System Development Build Specifications Sys Admin Training Development Classroom CBT Trainers Publications Website eMail Web Admin Support Desk Metrics User Response SysPerformance Support Desk Sys/Biz Admin

  14. 3 • SNL’s PDMLink Configuration Challenges

  15. Maintaining SNL’s PDMLink Configuration PROD QUAL DEV Hub CM by VM iDEV by VM TRN by VM

  16. Managing PDMLink with PDMLink SNL is using PDMLink’s Product Structure andChange Management functionality to govern its PDMLink PRODUCTION (PROD) deployment. This approach is helping SNL normalize its PDMLink Admin Roles and Processing to a minimal set responsibilities following the CMII Standard. This approach ensures the PDMLink Admin experience is the End User experience…

  17. SNL’s Value Proposition • SNL believes there is a true opportunity for the OOTB Baseline of PDMLink to be organized as a Product Structure. • Roles, Objects, Policies, Workflows, Lifecycles come fully defined (e.g. ready to go, not simply ready to configure). • PDMLink Admins would manage the Structure via Implementation Activities of the Change Process. • PDMLink Admins would iterate the Codebase files via the various Applet Utilities, xConfmanager Utility, etc. ONLY during the Change Process. • Builds are captured as Managed Baselines &/or End Item Configurations. SNL believes the PDMLink cost of ownership would improve with the full role / process definition –and– a top down configuration control of the solution.

  18. Summary • SNL has expanded PTC’s PDMLink Administrative Framework concept to include the Roles and Responsibilities essential to deploy PDMLink. • SNL has deployed an PDMLink Operations Process that blends Software Engineering and Configuration Management Standards. • SNL is using PDMLink to support the configuration manage of the Windchill solution within a Product Structure. • SNL believes that standardizing PDMLink in a “ready to go” baseline with true CM control is great opportunity to establish support resource levels, improve deployment time, user adoption, and reduce maintenance costs.

  19. End of Presentation X

  20. Change History

  21. Back Up Slides Back Up Slides X

  22. Pie Chart

  23. Pie Chart – 3D

  24. Bar Chart

  25. Line Chart

  26. Table Line width: .75pt Line color: gray Line width: 1.5pt Line color: gray

  27. If You Have an Image to Insert … To fill an entire slide with an image, create the image 1400 pixels wide (14.583 inches) by 1050 pixels tall (10.938 inches) at 96 dpi (pixels per inch). On a Windows system, the image will import to exactly the size of this slide. Use “.jpg” pictures to keep your presentation file size small.

  28. “If you have a quotation please use this slide. Go to the slide sorter and duplicate it. Then move your copy of the slide to where you want it in your presentation. Replace this text with your own. Move the credit to within one half inch of the bottom of the quote and align the right sides of both text boxes.” George WashingtonPresident, USA Inc.

  29. This is a blank slide with no rule line and no logo. Copy and paste it if you have a large graphic with no title, or two small photos with no title.

  30. Color Palette These colors are accessible from within the template: Core color palette Text Text Text Text Text Text R: 117 G: 190 B: 233 R: 141 G: 200 B: 90 R: 191 G: 191 B: 191 R: 0 G: 103 B: 180 R: 111 G: 174 B: 171 R: 213 G: 224 B: 77 Accent colors Core color palette Accent colors Text color – Gray Text color(Gray) R: 255 G: 198 B: 55 R: 77 G: 77 B: 79 R: 235 G: 183 B: 0

  31. New PowerPoint Template Improvements Click to add subtitle 2.69 Includes new branding elements New subtitle text box option on each slide Increased live area on slide for more layout flexibility 4.75 4.75 New footer text box option on each slide 3.45

More Related