Meeting Agenda 06-03-14

Meeting Agenda 06-03-14. Overview ( 概观 ) Questions from previous week ( 上周遗留问题 ) Optimization algorithm update ( 优化更新 ) Benefits ( 效 益 ). (1) Overview ( 概观 ). Previous Week and Current Week: Questions from previous weeks ( 上周遗留问题 ) Optimization algorithm update ( 优化更新 ) Next Week:

yoshi-walls
Télécharger la présentation

Meeting Agenda 06-03-14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting Agenda 06-03-14 • Overview (概观) • Questions from previous week (上周遗留问题) • Optimization algorithm update (优化更新) • Benefits (效益)

  2. (1) Overview (概观) • Previous Week and Current Week: • Questions from previous weeks (上周遗留问题) • Optimization algorithm update (优化更新) • Next Week: • Continue testing with harder scenarios (尝试较复杂情境) • Begin converting the algorithm so that it can create a schedule based on the data base (连结数据库生成排程)

  3. (2) Previous week questions • MATLAB line 79 to include Machine Breakdown time and Maintenance/ Delay during machining. • Done • MATLAB line 83 to include Numbers of machines on non-critical steps • This will be resolve by the data base. • Using same format of knowledge matrix on training and optimization (知识矩阵格式统一) • Decide by SEAS • MATLAB line 154 to count2=count2+6; +7 • 已修改成7

  4. (3) Optimization algorithm update • Since implementing the physical rules last week, we have been able to eliminate all non-linear constraints thereby reducing the optimization time. (刪除非线性约束从减少优化时间) • Scenario 14N currently takes 3.8 minutes to find a feasible starting point and from there it continues the optimization. (Refer to Excel for optimized schedule). (耗时3.8分钟生成第一代) • The scenario 14N represents a scenario that takes place during the later stages of production which means there is not much room for optimization (Work order constraints) • Since we have completed making the updated algorithm generic we will work on optimizing a schedule that represents an early production scenario. (尝试情境涉及较初步的零件(半方管,中部导向管,45 90度半双联管AB型))

  5. (4) Benefits (效益) • Please refer to the optimized schedule. • Benefits of the updated optimization algorithm • Availability of the first schedule draft in 4 minutes as opposed to 5 hours. (4分钟内生成第一代可行的排成) • After producing a feasible schedule during the first generation of the algorithm, the optimization algorithm continues to optimize the schedule rather than just producing a feasible schedule. (第一代完成后,优化算法继续针对输出指标进行优化) • Strict adherence to standard time as opposed to non conformance (生成的排成严格遵守给予的单位工时)