1 / 15

Twinning Project TR 08 IB EN 03

Twinning Project TR 08 IB EN 03. Integrated Permitting and Inspection in Turkey. Project over view & activities. Cesar Seoanez – Resident Twinning Advisor. Outline. Context. Communication. Goals. Activities :. Calendar. Outputs. Context.

zahur
Télécharger la présentation

Twinning Project TR 08 IB EN 03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Twinning Project TR 08 IB EN 03 Integrated Permitting and Inspection in Turkey Project over view & activities Cesar Seoanez– Resident Twinning Advisor

  2. Outline • Context • Communication • Goals • Activities: • Calendar • Outputs Twinning project - TR/2008/IB/EN/03

  3. Context • EU Integratedapproachtoprotectenvironment: • Directive 96/61/EC 08/1/EC Industrial Emissions 10/75/EU EIA: 97/11/EC Industries: 01/80/EC, 99/13/EC, 00/76/EC… • WefocusonChaptersI & II of new Directive • Togetherwith a TechnicalAssistanceProject: installationsinventory

  4. Communication • Visibility materials: • Flyer • Small guide on the subject • Website: http://ippc.cevreorman.gov.tr • Work in progress • cesarseoanez.ippc@gmail.com Twinning project - TR/2008/IB/EN/03

  5. Goals • 4 objectives: PublicAdministrationcapable of implementingintegratedpermitting & inspection Alignmentwith EU acquisonthisfield Estimate of technical, institutional & financial resources needed Capacity building: supporting materials & training

  6. Faaliyetler & Takvim BAT değerlendirme opsiyonu , IPPC – PRTRlinkleri Değerlendirme& diğer adımlar + Proje’nin kapanışı Yeni idari yapının tanımlanması + Koordinasyon mekanziması Açılış Yönetmeliğin 2. Taslağı 4 sektör için eğitimler Proje ayı OCAK ARA LIK 2012 OCAK 4 sektör kılavuzu Yönetmeliğin 1. taslağı + İdari prosedür Kaynakların ölçülmesi + İlk izin verme işlemi için strateji Sanayi ve ÇOB için genel kılavuz İspanya& Polonya sistemlerinin kıyaslanması + Güncellemek IPPC Eylem Planı Twinning project - TR/2008/IB/EN/03

  7. Faaliyetler & Takvim 1. PublicAdministrationcapable of implementingintegratedpermitting & inspection Değerlendirme& diğer adımlar + Proje’nin kapanışı Yeni idari yapının tanımlanması + Koordinasyon mekanziması Proje ayı OCAK ARA LIK 2012 OCAK Feedback İspanya& Polonya sistemlerinin kıyaslanması + Güncellemek IPPC Eylem Planı Twinning project - TR/2008/IB/EN/03

  8. Faaliyetler & Takvim 1. PublicAdministrationcapable of implementingintegratedpermitting & inspection • Outputs: • Action Plan for implementation of Chapters I & II (old IPPC) • of Industrial Emissions Directive (IED) 2010/75/EU • Document suggesting the administrative structures for implementation • of Chapters I & II (old IPPC) of IED 2010/75/EU • Document identifying public bodies and stakeholders which should • be coordinated, suggesting mechanisms and needed resources Twinning project - TR/2008/IB/EN/03

  9. Faaliyetler & Takvim Alignmentwith EU acquisonthisfield Yönetmeliğin 2. Taslağı Proje ayı OCAK ARA LIK 2012 OCAK Feedback Yönetmeliğin 1. taslağı + İdari prosedür Twinning project - TR/2008/IB/EN/03

  10. Faaliyetler & Takvim Alignmentwith EU acquisonthisfield • Outputs: • Draft of the new Turkish by-law transposing Chapters I & II (old IPPC) • of IED 2010/75/EU Twinning project - TR/2008/IB/EN/03

  11. Faaliyetler & Takvim Estimate of technical, institutional & financial resources needed Yeni idari yapının tanımlanması + Koordinasyon mekanziması Proje ayı OCAK ARA LIK 2012 OCAK Kaynakların ölçülmesi + İlk izin verme işlemi için strateji Twinning project - TR/2008/IB/EN/03

  12. Faaliyetler & Takvim Estimate of technical, institutional & financial resources needed • Outputs: • Document estimating technical, institutional & financial resources • needed in the Public Administration to implement new by-law • Suggestions for the transitional phase Twinning project - TR/2008/IB/EN/03

  13. Faaliyetler & Takvim Capacity building: supporting materials & training BAT değerlendirme opsiyonu , IPPC – PRTRlinkleri 4 sektör için eğitimler Proje ayı OCAK ARA LIK 2012 OCAK 4 sektör kılavuzu Sanayi ve ÇOB için genel kılavuz Twinning project - TR/2008/IB/EN/03

  14. Faaliyetler & Takvim Capacity building: supporting materials & training • Outputs: • Document analysing the options and making recommendations for • the elaboration of sector guides and the implementation of BREFs • Basic guides for both industry and Public Administration • Sector guides for 4 sectors: Coal LCPs, Refineries, Iron & Steel (arc • furnaces), Textile • Training in those sectors with pilot cases: application & permit Twinning project - TR/2008/IB/EN/03

  15. Final comments • Yourcollaboration & comments are veryimportant Teşekkürler! cesarseoanez.ippc@gmail.com Twinning project - TR/2008/IB/EN/03

More Related